Merricourt Wind Energy Center is a 150 MW wind power plant in McIntosh County, North Dakota, operated by Otter Tail Power Co, and it generated 583,545 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.4% of the generation reported in North Dakota, and its capacity factor sits at the 89th percentile of U.S. wind plants. By 2025 generation it ranks 1,157th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

150 MWNameplate capacity
44%Capacity factor, 2025, 89th percentile, on 150 MW net summer
1.4%Of ND generation, 2025
5 yearsAverage generator age, by MW

How hard does the Merricourt Wind Energy Center plant run compared with other wind plants?

The Merricourt Wind Energy Center plant had a capacity factor of 44% in 2025 on 150 MW of net summer capacity, the 89th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 162 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Merricourt Wind Energy Center44%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Merricourt Wind Energy Center plant generating more or less than last year?

Generation at Merricourt Wind Energy Center rose 1.8% from 2024 to 2025, from 573,477 MWh to 583,545 MWh. Through August 2026 it is running 5.5% behind the same months of 2025.

Net generation by period
PeriodMWh
2024573,477
2025583,545
2026 through August384,577
2025, same months406,929
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202634,349
July 202634,176
June 202648,342
May 202657,357
April 202651,325
March 202655,326
February 202649,393
January 202654,309
December 202539,884
November 202555,404
October 202548,879
September 202532,449
August 202538,573
July 202541,177
June 202537,548
May 202553,467
April 202543,249
March 202560,812
February 202558,170
January 202573,933
December 202454,752
November 202450,046
October 202458,524
September 202460,034
August 202453,419
July 202433,166
June 202450,841
May 202448,721
April 202442,846
March 202433,489
February 202440,082
January 202447,557

Source: EIA Form EIA-923, through August 2026.

How much of North Dakota's electricity comes from the Merricourt Wind Energy Center plant?

Merricourt Wind Energy Center made 1.4% of the 42,873,330 MWh reported by North Dakota plants in 2025, from 1.4% of the state's 10,973 MW of capacity. By capacity it is the 19th largest of 62 plants in North Dakota, the 1,967th largest of 14,327 in the U.S. and the 450th largest of 1,358 wind plants. By 2025 generation it is the 16th largest of 57 generating plants in the state.

Merricourt Wind Energy Center within North Dakota, 2025
MeasureThis plantNorth DakotaShare
Capacity (MW)15010,9731.4%
Generation (MWh)583,54542,873,3301.4%
Wind capacity (MW)1504,7293.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Merricourt Wind Energy Center plant, and when do they retire?

1 operable generator totals 150 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1150100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine1502020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Merricourt Wind Energy Center plant?

EIA lists no joint owners for Merricourt Wind Energy Center. Otter Tail Power Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Otter Tail Power Co charge homes?

Otter Tail Power Co, the operator of Merricourt Wind Energy Center, had an average residential price of 11.07¢ per kWh and an average bill of $120 a month in 2025, 6% below the North Dakota average of 11.82¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst North Dakota
Otter Tail Power Co11.07¢$1206% lower
North Dakota average11.82¢$126
U.S. average17.23¢$15146% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Merricourt Wind Energy Center plant?

Merricourt Wind Energy Center is in Kulm, McIntosh County, North Dakota, at 46.1075° N, 99.0592° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in North Dakota are similar in size?

North Dakota has 41 operable wind plants with 4,729 MW of capacity, and Merricourt Wind Energy Center's 150 MW is 3% of that.

Wind plants in North Dakota around this size
PlantCountyMW2025 MWh
Oliver Wind IVOliver199799,471
Tatanka Wind Power LLCDickey180476,125
Thunder Spirit Wind, LLCAdams156568,297
Merricourt Wind Energy CenterMcIntosh150583,545
Border Winds Wind FarmRolette150344,851
Lindahl Wind Project, LLCWilliams150484,718
Brady II Wind Energy CenterStark150640,497