Oliver Wind IV power plant, North Dakota

Oliver Wind IV is a 199 MW wind power plant in Oliver County, North Dakota, operated by Oliver Wind IV, LLC, and it generated 799,471 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.9% of the generation reported in North Dakota, and its capacity factor sits at the 93rd percentile of U.S. wind plants. By 2025 generation it ranks 877th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

199 MWNameplate capacity
46%Capacity factor, 2025, 93rd percentile, on 199 MW net summer
1.9%Of ND generation, 2025
1 yearAverage generator age, by MW

How hard does the Oliver Wind IV plant run compared with other wind plants?

The Oliver Wind IV plant had a capacity factor of 46% in 2025 on 199 MW of net summer capacity, the 93rd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 168 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Oliver Wind IV46%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Oliver Wind IV plant generating more or less than last year?

Oliver Wind IV generated 799,471 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 3.8% ahead of the same months of 2025. 2024 has output for only 1 month, so the two years are not compared.

Net generation by period
PeriodMWh
202439,699
2025799,471
2026 through August532,970
2025, same months513,242
Monthly generation, Dec 2024 to Aug 2026
MonthMWh
August 202652,310
July 202651,916
June 202669,704
May 202680,913
April 202677,495
March 202670,610
February 202658,449
January 202671,573
December 202582,009
November 202566,515
October 202585,824
September 202551,881
August 202557,932
July 202550,305
June 202552,421
May 202569,615
April 202574,402
March 202557,871
February 202558,147
January 202592,549
December 202439,699

Source: EIA Form EIA-923, through August 2026.

How much of North Dakota's electricity comes from the Oliver Wind IV plant?

Oliver Wind IV made 1.9% of the 42,873,330 MWh reported by North Dakota plants in 2025, from 1.8% of the state's 10,973 MW of capacity. By capacity it is the 15th largest of 62 plants in North Dakota, the 1,655th largest of 14,327 in the U.S. and the 336th largest of 1,358 wind plants. By 2025 generation it is the 11th largest of 57 generating plants in the state.

Oliver Wind IV within North Dakota, 2025
MeasureThis plantNorth DakotaShare
Capacity (MW)19910,9731.8%
Generation (MWh)799,47142,873,3301.9%
Wind capacity (MW)1994,7294.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Oliver Wind IV plant, and when do they retire?

1 operable generator totals 199 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1199100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN4OperatingOnshore Wind Turbine1992024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Oliver Wind IV plant?

EIA lists no joint owners for Oliver Wind IV. Oliver Wind IV, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Oliver Wind IV plant?

Oliver Wind IV is in Hannover, Oliver County, North Dakota, at 47.1243° N, 101.6124° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in North Dakota are similar in size?

North Dakota has 41 operable wind plants with 4,729 MW of capacity, and Oliver Wind IV's 199 MW is 4% of that.

Wind plants in North Dakota around this size
PlantCountyMW2025 MWh
Emmons-Logan Wind, LLCEmmons200877,247
Bowman WindBowman200118,335
Burke Wind, LLCBurke199782,397
Oliver Wind IVOliver199799,471
Tatanka Wind Power LLCDickey180476,125
Thunder Spirit Wind, LLCAdams156568,297
Merricourt Wind Energy CenterMcIntosh150583,545