Coal power plant, New Hampshire

Merrimack coal power plant, New Hampshire

Merrimack is a 496 MW power plant, 459 MW of it coal, in Merrimack County, New Hampshire, operated by Granite Shore Power, and it generated 240,580 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.3% of the generation reported in New Hampshire, and its capacity factor sits at the 3rd percentile of U.S. coal plants. By 2025 generation it ranks 2,270th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

496 MWNameplate capacity
6%Capacity factor, 2025, coal units, 3rd percentile, on 439 MW net summer
1.3%Of NH generation, 2025
59 yearsAverage generator age, by MW

How hard does the Merrimack plant run compared with other coal plants?

The Merrimack plant's coal units had a capacity factor of 6% in 2025 on 439 MW of net summer capacity, the 3rd percentile of the 181 U.S. coal plants with at least 20 MW. The typical coal plant reached 49%. That equals about 23 days at full output out of 365.

0%Shaded: the middle half of coal plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Merrimack6%
Coal plants, 75th percentile63%
Coal plants, median49%
Coal plants, 25th percentile37%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its coal generators only. Values above 105% are left out of the comparison.

Is the Merrimack plant generating more or less than last year?

Merrimack generated 240,580 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 99.1% behind the same months of 2025. 2024 has output for only 9 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024225,744
2025240,580
2026 through August2,124
2025, same months240,414
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202668
July 2026122
June 202644
May 202623
April 20260
March 20260
February 2026332
January 20261,535
December 20250
November 2025145
October 20250
September 202521
August 202529,635
July 202563,269
June 202520,972
May 20250
April 2025100
March 202523
February 202529,101
January 202597,314
December 2024100,571
November 202422,512
October 202454
September 20240
August 202418,491
July 202448,488
June 2024108
May 202467
April 20240
March 20246,819
February 20240
January 202428,634

Source: EIA Form EIA-923, through August 2026.

How much of New Hampshire's electricity comes from the Merrimack plant?

Merrimack made 1.3% of the 19,112,246 MWh reported by New Hampshire plants in 2025, from 10.8% of the state's 4,582 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 4th largest of 61 plants in New Hampshire, the 743rd largest of 14,327 in the U.S. and the 120th largest of 195 coal plants on its coal units alone. By 2025 generation it is the 7th largest of 57 generating plants in the state.

Merrimack within New Hampshire, 2025
MeasureThis plantNew HampshireShare
Capacity (MW)4964,58210.8%
Generation (MWh)240,58019,112,2461.3%
Coal capacity (MW)459459100.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Merrimack plant, and when do they retire?

4 operable generators total 496 MW, with an average age of 59 years weighted by capacity at the end of 2025. 459 MW, 93% of operable capacity, has a planned retirement, the first in 2027.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1960s4496100%2027, 2028
Capacity retiring by year
YearUnitsMW retiringShare of plant
2027111423%
2028134670%
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Steam Coal11419602027
2Out of serviceConventional Steam Coal34619682028
GT1OperatingPetroleum Liquids191968n/a
GT2OperatingPetroleum Liquids191969n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Merrimack plant?

EIA lists no joint owners for Merrimack. Granite Shore Power operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Merrimack plant use?

Merrimack has capacity on 2 fuels: 93% coal and 7% petroleum. In 2025, coal made 100% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Coal45992.5%239,428
Petroleum377.5%1,152

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Merrimack plant?

Merrimack is in Bow, Merrimack County, New Hampshire, at 43.1411° N, 71.4692° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which New Hampshire power plants are similar in size?

Merrimack is the only operable coal plant in New Hampshire, so these are the plants of any fuel closest to its 496 MW.

Power plants in New Hampshire around this size
PlantFuelCountyMW2025 MWh
Granite RidgeNatural gasRockingham7903,398,436
Newington Energy CenterNatural gasRockingham6061,913,569
MerrimackCoalMerrimack496240,580
NewingtonPetroleumRockingham414132,077

Source: EIA Forms EIA-860 and EIA-923, 2025.