Midway Solar Farm III power plant, California
Midway Solar Farm III is a 20 MW solar power plant in Imperial County, California, operated by Greenbacker Renewable Energy Corporation, and it generated 40,372 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 50th percentile of U.S. solar plants. By 2025 generation it ranks 4,353rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Midway Solar Farm III plant run compared with other solar plants?
The Midway Solar Farm III plant had a capacity factor of 23% in 2025 on 20 MW of net summer capacity, the 50th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 84 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Midway Solar Farm III | 23% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Midway Solar Farm III plant generating more or less than last year?
Generation at Midway Solar Farm III fell 20.8% from 2024 to 2025, from 50,946 MWh to 40,372 MWh.
| Period | MWh |
|---|---|
| 2024 | 50,946 |
| 2025 | 40,372 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 2,293 |
| November 2025 | 2,557 |
| October 2025 | 3,262 |
| September 2025 | 2,833 |
| August 2025 | 2,778 |
| July 2025 | 4,886 |
| June 2025 | 5,357 |
| May 2025 | 5,148 |
| April 2025 | 4,399 |
| March 2025 | 1,325 |
| February 2025 | 2,620 |
| January 2025 | 2,914 |
| December 2024 | 2,544 |
| November 2024 | 2,863 |
| October 2024 | 3,821 |
| September 2024 | 4,417 |
| August 2024 | 4,938 |
| July 2024 | 5,350 |
| June 2024 | 5,884 |
| May 2024 | 5,784 |
| April 2024 | 5,213 |
| March 2024 | 4,103 |
| February 2024 | 3,411 |
| January 2024 | 2,618 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Midway Solar Farm III plant, and when do they retire?
1 operable generator totals 20 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 20 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| MSF3 | Operating | Solar Photovoltaic | 20 | 2018 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Midway Solar Farm III plant?
EIA lists no joint owners for Midway Solar Farm III. Greenbacker Renewable Energy Corporation operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Midway Solar Farm III plant?
Midway Solar Farm III is in Calipatria, Imperial County, California, at 33.1548° N, 115.5449° W. It sits in the Imperial Irrigation District balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Midway Solar Farm III's 20 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Antelope Big Sky Ranch | Los Angeles | 20 | 49,935 |
| Summer Solar LLC | Los Angeles | 20 | 55,880 |
| Portal Ridge Solar B, LLC | Los Angeles | 20 | 52,710 |
| Midway Solar Farm III | Imperial | 20 | 40,372 |
| Bayshore Solar B, LLC | Los Angeles | 20 | 41,660 |
| Bayshore Solar C, LLC | Los Angeles | 20 | 40,642 |
| Bayshore Solar A, LLC | Los Angeles | 20 | 44,379 |
Source: EIA Forms EIA-860 and EIA-923, 2025.