Skip to main content
RateWatt

Solar power plant, California

Portal Ridge Solar B, LLC power plant, California

Portal Ridge Solar B, LLC is a 20 MW solar power plant in Los Angeles County, California, operated by Portal Ridge Solar, LLC, and it generated 52,710 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 91st percentile of U.S. solar plants. By 2025 generation it ranks 4,033rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
30%Capacity factor, 2025, 91st percentile, on 20 MW net summer
4,033rdU.S. rank by generation, 2025
8 yearsAverage generator age, by MW

How hard does the Portal Ridge Solar B, LLC plant run compared with other solar plants?

The Portal Ridge Solar B, LLC plant had a capacity factor of 30% in 2025 on 20 MW of net summer capacity, the 91st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 110 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Portal Ridge Solar B, LLC30%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Portal Ridge Solar B, LLC plant generating more or less than last year?

Generation at Portal Ridge Solar B, LLC rose 12.5% from 2024 to 2025, from 46,869 MWh to 52,710 MWh.

Net generation by period
PeriodMWh
202446,869
202552,710
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20252,501
November 20252,340
October 20254,248
September 20254,847
August 20255,659
July 20256,283
June 20256,126
May 20256,145
April 20255,597
March 20253,453
February 20252,364
January 20253,147
December 20242,617
November 20242,786
October 20243,973
September 20244,839
August 20245,555
July 20245,004
June 20244,982
May 20245,122
April 20244,460
March 20243,067
February 20242,225
January 20242,239

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Portal Ridge Solar B, LLC plant?

Portal Ridge Solar B, LLC made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. Its share of output is 1.4 times its share of capacity. By capacity it is the 619th largest of 1,877 plants in California, the 4,775th largest of 14,327 in the U.S. and the 1,169th largest of 7,223 solar plants. By 2025 generation it is the 437th largest of 1,608 generating plants in the state.

Portal Ridge Solar B, LLC within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)20107,4330.0%
Generation (MWh)52,710204,542,8980.0%
Solar capacity (MW)2024,6630.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Portal Ridge Solar B, LLC plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN01OperatingSolar Photovoltaic202017n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Portal Ridge Solar B, LLC plant?

EIA lists no joint owners for Portal Ridge Solar B, LLC. Portal Ridge Solar, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Portal Ridge Solar B, LLC plant?

Portal Ridge Solar B, LLC is in Lancaster, Los Angeles County, California, at 34.7165° N, 118.2821° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Portal Ridge Solar B, LLC's 20 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Kingbird B Solar, LLCKern2055,167
Antelope Big Sky RanchLos Angeles2049,935
Summer Solar LLCLos Angeles2055,880
Portal Ridge Solar B, LLCLos Angeles2052,710
Midway Solar Farm IIIImperial2040,372
Bayshore Solar B, LLCLos Angeles2041,660
Bayshore Solar C, LLCLos Angeles2040,642

Source: EIA Forms EIA-860 and EIA-923, 2025.