Kingbird B Solar, LLC is a 20 MW solar power plant in Kern County, California, operated by Arevon Energy, Inc., and it generated 55,167 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 95th percentile of U.S. solar plants. By 2025 generation it ranks 3,971st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
31%Capacity factor, 2025, 95th percentile, on 20 MW net summer
3,971stU.S. rank by generation, 2025
9 yearsAverage generator age, by MW

How hard does the Kingbird B Solar, LLC plant run compared with other solar plants?

The Kingbird B Solar, LLC plant had a capacity factor of 31% in 2025 on 20 MW of net summer capacity, the 95th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 115 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Kingbird B Solar, LLC31%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Kingbird B Solar, LLC plant generating more or less than last year?

Generation at Kingbird B Solar, LLC fell 1.2% from 2024 to 2025, from 55,830 MWh to 55,167 MWh.

Net generation by period
PeriodMWh
202455,830
202555,167
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20252,320
November 20252,524
October 20254,431
September 20254,927
August 20255,885
July 20256,845
June 20256,476
May 20256,434
April 20255,128
March 20254,033
February 20253,202
January 20252,962
December 20242,572
November 20242,983
October 20244,279
September 20245,210
August 20246,150
July 20245,651
June 20246,404
May 20246,481
April 20245,695
March 20244,545
February 20243,202
January 20242,658

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Kingbird B Solar, LLC plant?

Kingbird B Solar, LLC made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. Its share of output is 1.4 times its share of capacity. By capacity it is the 619th largest of 1,877 plants in California, the 4,775th largest of 14,327 in the U.S. and the 1,166th largest of 7,223 solar plants. By 2025 generation it is the 424th largest of 1,608 generating plants in the state.

Kingbird B Solar, LLC within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)20107,4330.0%
Generation (MWh)55,167204,542,8980.0%
Solar capacity (MW)2024,6630.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Kingbird B Solar, LLC plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN01OperatingSolar Photovoltaic202016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Kingbird B Solar, LLC plant?

2 owners report shares in Kingbird B Solar, LLC; 8point3 Operating Company LLC holds the largest named share, 70.0% or about 14 MW. Arevon Energy, Inc. operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
8point3 Operating Company LLC70.0%1438,617
State Street Bank and Trust Company30.0%616,550

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

Where is the Kingbird B Solar, LLC plant?

Kingbird B Solar, LLC is in Rosamond, Kern County, California, at 34.8242° N, 118.4385° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Kingbird B Solar, LLC's 20 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
CED Ducor 1Tulare2052,334
CED Ducor 2Tulare2051,623
CED Ducor 4Tulare2051,797
Kingbird B Solar, LLCKern2055,167
Antelope Big Sky RanchLos Angeles2049,935
Summer Solar LLCLos Angeles2055,880
Portal Ridge Solar B, LLCLos Angeles2052,710