Solar power plant, California

CED Ducor 2 solar power plant, California

CED Ducor 2 is a 20 MW solar power plant in Tulare County, California, operated by RWE Clean Energy, and it generated 51,623 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 89th percentile of U.S. solar plants. By 2025 generation it ranks 4,062nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
29%Capacity factor, 2025, 89th percentile, on 20 MW net summer
4,062ndU.S. rank by generation, 2025
9 yearsAverage generator age, by MW

How hard does the CED Ducor 2 plant run compared with other solar plants?

The CED Ducor 2 plant had a capacity factor of 29% in 2025 on 20 MW of net summer capacity, the 89th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 108 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
CED Ducor 229%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the CED Ducor 2 plant generating more or less than last year?

Generation at CED Ducor 2 fell 1.0% from 2024 to 2025, from 52,158 MWh to 51,623 MWh.

Net generation by period
PeriodMWh
202452,158
202551,623
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20251,043
November 20252,020
October 20254,045
September 20254,703
August 20255,902
July 20256,444
June 20256,514
May 20256,277
April 20254,926
March 20253,823
February 20252,848
January 20253,078
December 20241,939
November 20242,241
October 20243,582
September 20244,769
August 20245,871
July 20246,122
June 20246,440
May 20246,743
April 20245,110
March 20244,328
February 20242,939
January 20242,074

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the CED Ducor 2 plant?

CED Ducor 2 made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. Its share of output is 1.4 times its share of capacity. By capacity it is the 619th largest of 1,877 plants in California, the 4,775th largest of 14,327 in the U.S. and the 1,164th largest of 7,223 solar plants. By 2025 generation it is the 447th largest of 1,608 generating plants in the state.

CED Ducor 2 within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)20107,4330.0%
Generation (MWh)51,623204,542,8980.0%
Solar capacity (MW)2024,6630.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the CED Ducor 2 plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
DU2CAOperatingSolar Photovoltaic202016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the CED Ducor 2 plant?

EIA lists no joint owners for CED Ducor 2. RWE Clean Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the CED Ducor 2 plant?

CED Ducor 2 is in Ducor, Tulare County, California, at 35.8442° N, 119.0681° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and CED Ducor 2's 20 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Adera SolarMadera2032,720
Frontier Solar LLCStanislaus2047,900
CED Ducor 1Tulare2052,334
CED Ducor 2Tulare2051,623
CED Ducor 4Tulare2051,797
Kingbird B Solar, LLCKern2055,167
Antelope Big Sky RanchLos Angeles2049,935

Source: EIA Forms EIA-860 and EIA-923, 2025.