Frontier Solar LLC power plant, California

Frontier Solar LLC is a 20 MW solar power plant in Stanislaus County, California, operated by Boralex US Operations LLC, and it generated 47,900 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 79th percentile of U.S. solar plants. By 2025 generation it ranks 4,153rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
27%Capacity factor, 2025, 79th percentile, on 20 MW net summer
4,153rdU.S. rank by generation, 2025
9 yearsAverage generator age, by MW

How hard does the Frontier Solar LLC plant run compared with other solar plants?

The Frontier Solar LLC plant had a capacity factor of 27% in 2025 on 20 MW of net summer capacity, the 79th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 100 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Frontier Solar LLC27%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Frontier Solar LLC plant generating more or less than last year?

Generation at Frontier Solar LLC rose 24.0% from 2024 to 2025, from 38,627 MWh to 47,900 MWh.

Net generation by period
PeriodMWh
202438,627
202547,900
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 2025668
November 20251,970
October 20253,856
September 20254,613
August 20255,649
July 20255,974
June 20256,102
May 20256,221
April 20254,394
March 20253,166
February 20252,617
January 20252,670
December 20241,715
November 20242,444
October 20243,384
September 20243,840
August 20244,685
July 20243,054
June 20244,331
May 20243,596
April 20244,552
March 20243,437
February 20242,144
January 20241,445

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Frontier Solar LLC plant?

Frontier Solar LLC made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 619th largest of 1,877 plants in California, the 4,775th largest of 14,327 in the U.S. and the 1,162nd largest of 7,223 solar plants. By 2025 generation it is the 472nd largest of 1,608 generating plants in the state.

Frontier Solar LLC within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)20107,4330.0%
Generation (MWh)47,900204,542,8980.0%
Solar capacity (MW)2024,6630.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Frontier Solar LLC plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
FTRSOperatingSolar Photovoltaic202016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Frontier Solar LLC plant?

2 owners report shares in Frontier Solar LLC; Boralex Frontier Solar California LLC holds the largest named share, 50.0% or about 10 MW. Boralex US Operations LLC operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
Boralex Frontier Solar California LLC50.0%1023,950
Gsppr LLC50.0%1023,950

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

Where is the Frontier Solar LLC plant?

Frontier Solar LLC is in Newman, Stanislaus County, California, at 37.3799° N, 121.1307° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Frontier Solar LLC's 20 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
North Lancaster RanchLos Angeles2038,557
Central Antelope Dry Ranch CLos Angeles2038,946
Adera SolarMadera2032,720
Frontier Solar LLCStanislaus2047,900
CED Ducor 1Tulare2052,334
CED Ducor 2Tulare2051,623
CED Ducor 4Tulare2051,797

Source: EIA Forms EIA-860 and EIA-923, 2025.