Skip to main content
RateWatt

Solar power plant, California

Central Antelope Dry Ranch C solar power plant, California

Central Antelope Dry Ranch C is a 20 MW solar power plant in Los Angeles County, California, operated by AES Distributed Energy, and it generated 38,946 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 72nd percentile of U.S. solar plants. By 2025 generation it ranks 4,393rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
26%Capacity factor, 2025, 72nd percentile, on 17 MW net summer
4,393rdU.S. rank by generation, 2025
9 yearsAverage generator age, by MW

How hard does the Central Antelope Dry Ranch C plant run compared with other solar plants?

The Central Antelope Dry Ranch C plant had a capacity factor of 26% in 2025 on 17 MW of net summer capacity, the 72nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 95 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Central Antelope Dry Ranch C26%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Central Antelope Dry Ranch C plant generating more or less than last year?

Generation at Central Antelope Dry Ranch C rose 16.9% from 2024 to 2025, from 33,318 MWh to 38,946 MWh.

Net generation by period
PeriodMWh
202433,318
202538,946
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20251,573
November 20251,755
October 20253,546
September 20253,626
August 20253,905
July 20254,008
June 20254,039
May 20254,230
April 20254,161
March 20253,404
February 20252,796
January 20251,903
December 20241,610
November 20241,886
October 20243,150
September 20243,471
August 20243,719
July 20243,468
June 20242,832
May 20242,600
April 20243,300
March 20243,349
February 20242,303
January 20241,630

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Central Antelope Dry Ranch C plant?

Central Antelope Dry Ranch C made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. By capacity it is the 619th largest of 1,877 plants in California, the 4,775th largest of 14,327 in the U.S. and the 1,155th largest of 7,223 solar plants. By 2025 generation it is the 527th largest of 1,608 generating plants in the state.

Central Antelope Dry Ranch C within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)20107,4330.0%
Generation (MWh)38,946204,542,8980.0%
Solar capacity (MW)2024,6630.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Central Antelope Dry Ranch C plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CADRCOperatingSolar Photovoltaic202016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Central Antelope Dry Ranch C plant?

Central Antelope Dry Ranch C LLC is the only joint owner reported for Central Antelope Dry Ranch C, with 100.0%. AES Distributed Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Central Antelope Dry Ranch C plant?

Central Antelope Dry Ranch C is in Lancaster, Los Angeles County, California, at 34.7205° N, 118.3005° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Central Antelope Dry Ranch C's 20 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Oro LomaFresno2049,174
Western Antelope Blue Sky BLos Angeles2052,233
North Lancaster RanchLos Angeles2038,557
Central Antelope Dry Ranch CLos Angeles2038,946
Adera SolarMadera2032,720
Frontier Solar LLCStanislaus2047,900
CED Ducor 1Tulare2052,334

Source: EIA Forms EIA-860 and EIA-923, 2025.