Skip to main content
RateWatt

Solar power plant, California

Adera Solar power plant, California

Adera Solar is a 20 MW solar power plant in Madera County, California, operated by AES Distributed Energy, and it generated 32,720 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 24th percentile of U.S. solar plants. By 2025 generation it ranks 4,632nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
20%Capacity factor, 2025, 24th percentile, on 19 MW net summer
4,632ndU.S. rank by generation, 2025
10 yearsAverage generator age, by MW

How hard does the Adera Solar plant run compared with other solar plants?

The Adera Solar plant had a capacity factor of 20% in 2025 on 19 MW of net summer capacity, the 24th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 72 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Adera Solar20%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Adera Solar plant generating more or less than last year?

Generation at Adera Solar rose 89.6% from 2024 to 2025, from 17,258 MWh to 32,720 MWh.

Net generation by period
PeriodMWh
202417,258
202532,720
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 2025885
November 20251,766
October 20253,211
September 20253,184
August 20253,741
July 20253,911
June 20253,459
May 20252,631
April 20251,957
March 20252,977
February 20251,998
January 20253,000
December 20241,770
November 20241,887
October 2024898
September 2024374
August 2024418
July 2024950
June 20241,609
May 20241,299
April 20241,000
March 20243,165
February 20242,238
January 20241,650

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Adera Solar plant?

Adera Solar made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. By capacity it is the 619th largest of 1,877 plants in California, the 4,775th largest of 14,327 in the U.S. and the 1,161st largest of 7,223 solar plants. By 2025 generation it is the 578th largest of 1,608 generating plants in the state.

Adera Solar within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)20107,4330.0%
Generation (MWh)32,720204,542,8980.0%
Solar capacity (MW)2024,6630.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Adera Solar plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
ADERAOperatingSolar Photovoltaic202015n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Adera Solar plant?

EIA lists no joint owners for Adera Solar. AES Distributed Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Adera Solar plant?

Adera Solar is in Chowchilla, Madera County, California, at 37.1206° N, 120.3249° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Adera Solar's 20 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Western Antelope Blue Sky BLos Angeles2052,233
North Lancaster RanchLos Angeles2038,557
Central Antelope Dry Ranch CLos Angeles2038,946
Adera SolarMadera2032,720
Frontier Solar LLCStanislaus2047,900
CED Ducor 1Tulare2052,334
CED Ducor 2Tulare2051,623

Source: EIA Forms EIA-860 and EIA-923, 2025.