Skip to main content
RateWatt

Wind power plant, Utah

Milford Wind Corridor I LLC power plant, Utah

Milford Wind Corridor I LLC is a 204 MW wind power plant in Beaver County, Utah, operated by Milford Wind Corridor Phase I, LLC (Longroad), and it generated 401,437 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.1% of the generation reported in Utah, and its capacity factor sits at the 15th percentile of U.S. wind plants. By 2025 generation it ranks 1,584th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

204 MWNameplate capacity
23%Capacity factor, 2025, 15th percentile, on 204 MW net summer
1.1%Of UT generation, 2025
16 yearsAverage generator age, by MW

How hard does the Milford Wind Corridor I LLC plant run compared with other wind plants?

The Milford Wind Corridor I LLC plant had a capacity factor of 23% in 2025 on 204 MW of net summer capacity, the 15th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 82 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Milford Wind Corridor I LLC23%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Milford Wind Corridor I LLC plant generating more or less than last year?

Generation at Milford Wind Corridor I LLC rose 5.8% from 2024 to 2025, from 379,444 MWh to 401,437 MWh. Through August 2026 it is running 10.1% behind the same months of 2025.

Net generation by period
PeriodMWh
2024379,444
2025401,437
2026 through August246,407
2025, same months273,967
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202633,896
July 202635,771
June 202639,204
May 202630,823
April 20266,287
March 202641,586
February 202630,315
January 202628,525
December 202537,620
November 202526,922
October 202532,441
September 202530,487
August 202535,569
July 202546,221
June 202521,491
May 202522,252
April 202526,342
March 202550,265
February 202543,691
January 202528,136
December 202427,059
November 202436,018
October 202432,140
September 202423,211
August 202443,956
July 202421,370
June 202437,074
May 202426,359
April 202422,208
March 202442,120
February 202436,606
January 202431,323

Source: EIA Form EIA-923, through August 2026.

How much of Utah's electricity comes from the Milford Wind Corridor I LLC plant?

Milford Wind Corridor I LLC made 1.1% of the 38,124,679 MWh reported by Utah plants in 2025, from 1.8% of the state's 11,140 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 10th largest of 126 plants in Utah, the 1,472nd largest of 14,327 in the U.S. and the 232nd largest of 1,358 wind plants. By 2025 generation it is the 10th largest of 117 generating plants in the state.

Milford Wind Corridor I LLC within Utah, 2025
MeasureThis plantUtahShare
Capacity (MW)20411,1401.8%
Generation (MWh)401,43738,124,6791.1%
Wind capacity (MW)20439052.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Milford Wind Corridor I LLC plant, and when do they retire?

1 operable generator totals 204 MW, with an average age of 16 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s1204100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine2042009n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Milford Wind Corridor I LLC plant?

EIA lists no joint owners for Milford Wind Corridor I LLC. Milford Wind Corridor Phase I, LLC (Longroad) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Milford Wind Corridor I LLC plant?

Milford Wind Corridor I LLC is in Milford, Beaver County, Utah, at 38.5357° N, 112.9350° W. It sits in the Los Angeles Department of Water and Power balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Utah are similar in size?

Utah has 5 operable wind plants with 390 MW of capacity, and Milford Wind Corridor I LLC's 204 MW is 52% of that.

Wind plants in Utah around this size
PlantCountyMW2025 MWh
Milford Wind Corridor I LLCBeaver204401,437
Milford Wind Corridor Stage II LLCBeaver102198,515

Source: EIA Forms EIA-860 and EIA-923, 2025.