Wind power plant, Utah

Milford Wind Corridor Stage II LLC power plant, Utah

Milford Wind Corridor Stage II LLC is a 102 MW wind power plant in Beaver County, Utah, operated by Milford Wind Corridor Stage II LLC, and it generated 198,515 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Utah, and its capacity factor sits at the 14th percentile of U.S. wind plants. By 2025 generation it ranks 2,502nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

102 MWNameplate capacity
22%Capacity factor, 2025, 14th percentile, on 102 MW net summer
0.5%Of UT generation, 2025
14 yearsAverage generator age, by MW

How hard does the Milford Wind Corridor Stage II LLC plant run compared with other wind plants?

The Milford Wind Corridor Stage II LLC plant had a capacity factor of 22% in 2025 on 102 MW of net summer capacity, the 14th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 81 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Milford Wind Corridor Stage II LLC22%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Milford Wind Corridor Stage II LLC plant generating more or less than last year?

Generation at Milford Wind Corridor Stage II LLC rose 15.4% from 2024 to 2025, from 171,996 MWh to 198,515 MWh. Through August 2026 it is running 23.0% behind the same months of 2025.

Net generation by period
PeriodMWh
2024171,996
2025198,515
2026 through August107,804
2025, same months140,046
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202615,259
July 202616,178
June 202618,030
May 202613,828
April 2026529
March 202617,055
February 202614,168
January 202612,757
December 202517,500
November 202512,223
October 202514,946
September 202513,800
August 202515,964
July 202522,570
June 202520,397
May 202511,333
April 202511,807
March 202523,784
February 202521,309
January 202512,882
December 202411,877
November 202414,853
October 202412,950
September 202410,327
August 202419,890
July 202410,153
June 202417,041
May 202413,715
April 20249,839
March 202420,987
February 202416,961
January 202413,403

Source: EIA Form EIA-923, through August 2026.

How much of Utah's electricity comes from the Milford Wind Corridor Stage II LLC plant?

Milford Wind Corridor Stage II LLC made 0.5% of the 38,124,679 MWh reported by Utah plants in 2025, from 0.9% of the state's 11,140 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 17th largest of 126 plants in Utah, the 2,550th largest of 14,327 in the U.S. and the 637th largest of 1,358 wind plants. By 2025 generation it is the 32nd largest of 117 generating plants in the state.

Milford Wind Corridor Stage II LLC within Utah, 2025
MeasureThis plantUtahShare
Capacity (MW)10211,1400.9%
Generation (MWh)198,51538,124,6790.5%
Wind capacity (MW)10239026.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Milford Wind Corridor Stage II LLC plant, and when do they retire?

1 operable generator totals 102 MW, with an average age of 14 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1102100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine1022011n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Milford Wind Corridor Stage II LLC plant?

EIA lists no joint owners for Milford Wind Corridor Stage II LLC. Milford Wind Corridor Stage II LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Milford Wind Corridor Stage II LLC plant?

Milford Wind Corridor Stage II LLC is in Milford, Beaver County, Utah, at 38.5852° N, 112.9310° W. It sits in the Los Angeles Department of Water and Power balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Utah are similar in size?

Utah has 5 operable wind plants with 390 MW of capacity, and Milford Wind Corridor Stage II LLC's 102 MW is 26% of that.

Wind plants in Utah around this size
PlantCountyMW2025 MWh
Milford Wind Corridor I LLCBeaver204401,437
Milford Wind Corridor Stage II LLCBeaver102198,515
Latigo Wind ParkSan Juan62151,537

Source: EIA Forms EIA-860 and EIA-923, 2025.