Wind power plant, Utah
Milford Wind Corridor Stage II LLC power plant, Utah
Milford Wind Corridor Stage II LLC is a 102 MW wind power plant in Beaver County, Utah, operated by Milford Wind Corridor Stage II LLC, and it generated 198,515 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Utah, and its capacity factor sits at the 14th percentile of U.S. wind plants. By 2025 generation it ranks 2,502nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Milford Wind Corridor Stage II LLC plant run compared with other wind plants?
The Milford Wind Corridor Stage II LLC plant had a capacity factor of 22% in 2025 on 102 MW of net summer capacity, the 14th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 81 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Milford Wind Corridor Stage II LLC | 22% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Milford Wind Corridor Stage II LLC plant generating more or less than last year?
Generation at Milford Wind Corridor Stage II LLC rose 15.4% from 2024 to 2025, from 171,996 MWh to 198,515 MWh. Through August 2026 it is running 23.0% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 171,996 |
| 2025 | 198,515 |
| 2026 through August | 107,804 |
| 2025, same months | 140,046 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 15,259 |
| July 2026 | 16,178 |
| June 2026 | 18,030 |
| May 2026 | 13,828 |
| April 2026 | 529 |
| March 2026 | 17,055 |
| February 2026 | 14,168 |
| January 2026 | 12,757 |
| December 2025 | 17,500 |
| November 2025 | 12,223 |
| October 2025 | 14,946 |
| September 2025 | 13,800 |
| August 2025 | 15,964 |
| July 2025 | 22,570 |
| June 2025 | 20,397 |
| May 2025 | 11,333 |
| April 2025 | 11,807 |
| March 2025 | 23,784 |
| February 2025 | 21,309 |
| January 2025 | 12,882 |
| December 2024 | 11,877 |
| November 2024 | 14,853 |
| October 2024 | 12,950 |
| September 2024 | 10,327 |
| August 2024 | 19,890 |
| July 2024 | 10,153 |
| June 2024 | 17,041 |
| May 2024 | 13,715 |
| April 2024 | 9,839 |
| March 2024 | 20,987 |
| February 2024 | 16,961 |
| January 2024 | 13,403 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Milford Wind Corridor Stage II LLC plant, and when do they retire?
1 operable generator totals 102 MW, with an average age of 14 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 102 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Onshore Wind Turbine | 102 | 2011 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Milford Wind Corridor Stage II LLC plant?
EIA lists no joint owners for Milford Wind Corridor Stage II LLC. Milford Wind Corridor Stage II LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Milford Wind Corridor Stage II LLC plant?
Milford Wind Corridor Stage II LLC is in Milford, Beaver County, Utah, at 38.5852° N, 112.9310° W. It sits in the Los Angeles Department of Water and Power balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Utah are similar in size?
Utah has 5 operable wind plants with 390 MW of capacity, and Milford Wind Corridor Stage II LLC's 102 MW is 26% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Milford Wind Corridor I LLC | Beaver | 204 | 401,437 |
| Milford Wind Corridor Stage II LLC | Beaver | 102 | 198,515 |
| Latigo Wind Park | San Juan | 62 | 151,537 |
Source: EIA Forms EIA-860 and EIA-923, 2025.