Wind power plant, Minnesota
MinnDakota Wind LLC power plant, Minnesota
MinnDakota Wind LLC is a 150 MW wind power plant in Lincoln County, Minnesota, operated by Avangrid Power LLC, and it generated 337,313 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in Minnesota, and its capacity factor sits at the 24th percentile of U.S. wind plants. By 2025 generation it ranks 1,821st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the MinnDakota Wind LLC plant run compared with other wind plants?
The MinnDakota Wind LLC plant had a capacity factor of 26% in 2025 on 150 MW of net summer capacity, the 24th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 94 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| MinnDakota Wind LLC | 26% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the MinnDakota Wind LLC plant generating more or less than last year?
Generation at MinnDakota Wind LLC rose 19.2% from 2024 to 2025, from 282,911 MWh to 337,313 MWh.
| Period | MWh |
|---|---|
| 2024 | 282,911 |
| 2025 | 337,313 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 31,044 |
| November 2025 | 23,846 |
| October 2025 | 25,635 |
| September 2025 | 17,712 |
| August 2025 | 20,938 |
| July 2025 | 23,977 |
| June 2025 | 26,398 |
| May 2025 | 26,039 |
| April 2025 | 26,810 |
| March 2025 | 39,024 |
| February 2025 | 33,590 |
| January 2025 | 42,300 |
| December 2024 | 28,320 |
| November 2024 | 20,514 |
| October 2024 | 22,174 |
| September 2024 | 12,697 |
| August 2024 | 16,823 |
| July 2024 | 17,524 |
| June 2024 | 26,564 |
| May 2024 | 29,704 |
| April 2024 | 19,276 |
| March 2024 | 26,862 |
| February 2024 | 28,223 |
| January 2024 | 34,230 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the MinnDakota Wind LLC plant, and when do they retire?
1 operable generator totals 150 MW, with an average age of 17 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 150 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 2 | Operating | Onshore Wind Turbine | 150 | 2008 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the MinnDakota Wind LLC plant?
EIA lists no joint owners for MinnDakota Wind LLC. Avangrid Power LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the MinnDakota Wind LLC plant?
MinnDakota Wind LLC is in Ivanhoe, Lincoln County, Minnesota, at 44.2667° N, 96.3444° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Minnesota are similar in size?
Minnesota has 121 operable wind plants with 4,956 MW of capacity, and MinnDakota Wind LLC's 150 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Blazing Star Wind Farm 1 | Lincoln | 200 | 872,782 |
| Red Pine Wind Project | Lincoln | 200 | 773,581 |
| Blazing Star 2 Wind Farm | Lincoln | 200 | 865,217 |
| MinnDakota Wind LLC | Lincoln | 150 | 337,313 |
| Elm Creek Wind II LLC | Martin | 149 | 187,076 |
| Walleye Wind | Rock | 110 | 479,236 |
| Lake Benton I | Lincoln | 107 | 234,735 |
Source: EIA Forms EIA-860 and EIA-923, 2025.