Skip to main content
RateWatt

Wind power plant, Minnesota

Blazing Star 2 Wind Farm, Minnesota

Blazing Star 2 Wind Farm is a 200 MW wind power plant in Lincoln County, Minnesota, operated by Northern States Power Co-Minnesota, and it generated 865,217 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.5% of the generation reported in Minnesota, and its capacity factor sits at the 98th percentile of U.S. wind plants. By 2025 generation it ranks 821st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
49%Capacity factor, 2025, 98th percentile, on 200 MW net summer
1.5%Of MN generation, 2025
4 yearsAverage generator age, by MW

How hard does the Blazing Star 2 Wind Farm plant run compared with other wind plants?

The Blazing Star 2 Wind Farm plant had a capacity factor of 49% in 2025 on 200 MW of net summer capacity, the 98th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 180 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Blazing Star 2 Wind Farm49%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Blazing Star 2 Wind Farm plant generating more or less than last year?

Generation at Blazing Star 2 Wind Farm rose 4.7% from 2024 to 2025, from 826,752 MWh to 865,217 MWh. Through August 2026 it is running 5.5% behind the same months of 2025.

Net generation by period
PeriodMWh
2024826,752
2025865,217
2026 through August530,239
2025, same months560,989
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202637,903
July 202642,511
June 202666,834
May 202675,835
April 202674,674
March 202684,209
February 202668,246
January 202680,027
December 202584,685
November 202576,431
October 202590,690
September 202552,422
August 202543,392
July 202549,425
June 202557,526
May 202567,113
April 202584,243
March 202588,461
February 202575,125
January 202595,704
December 202474,035
November 202466,900
October 202479,457
September 202472,509
August 202441,212
July 202426,445
June 202461,421
May 202479,320
April 202494,952
March 202488,931
February 202471,832
January 202469,738

Source: EIA Form EIA-923, through August 2026.

How much of Minnesota's electricity comes from the Blazing Star 2 Wind Farm plant?

Blazing Star 2 Wind Farm made 1.5% of the 58,638,010 MWh reported by Minnesota plants in 2025, from 1.0% of the state's 19,860 MW of capacity. Its share of output is 1.5 times its share of capacity. By capacity it is the 25th largest of 804 plants in Minnesota, the 1,524th largest of 14,327 in the U.S. and the 308th largest of 1,358 wind plants. By 2025 generation it is the 11th largest of 760 generating plants in the state.

Blazing Star 2 Wind Farm within Minnesota, 2025
MeasureThis plantMinnesotaShare
Capacity (MW)20019,8601.0%
Generation (MWh)865,21758,638,0101.5%
Wind capacity (MW)2004,9564.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Blazing Star 2 Wind Farm plant, and when do they retire?

1 operable generator totals 200 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1200100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BLZS2OperatingOnshore Wind Turbine2002021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Blazing Star 2 Wind Farm plant?

EIA lists no joint owners for Blazing Star 2 Wind Farm. Northern States Power Co-Minnesota operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Northern States Power Co - Minnesota charge homes?

Northern States Power Co - Minnesota, the operator of Blazing Star 2 Wind Farm, had an average residential price of 17.07¢ per kWh and an average bill of $105 a month in 2025, 8% above the Minnesota average of 15.83¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Minnesota
Northern States Power Co - Minnesota17.07¢$1058% higher
Minnesota average15.83¢$118
U.S. average17.23¢$1519% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Blazing Star 2 Wind Farm plant?

Blazing Star 2 Wind Farm is in Hendricks, Lincoln County, Minnesota, at 44.4453° N, 96.3528° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Minnesota are similar in size?

Minnesota has 121 operable wind plants with 4,956 MW of capacity, and Blazing Star 2 Wind Farm's 200 MW is 4% of that.

Wind plants in Minnesota around this size
PlantCountyMW2025 MWh
Pleasant Valley Wind FarmMower200463,604
Blazing Star Wind Farm 1Lincoln200872,782
Red Pine Wind ProjectLincoln200773,581
Blazing Star 2 Wind FarmLincoln200865,217
MinnDakota Wind LLCLincoln150337,313
Elm Creek Wind II LLCMartin149187,076
Walleye WindRock110479,236

Source: EIA Forms EIA-860 and EIA-923, 2025.