Pleasant Valley Wind Farm, Minnesota

Pleasant Valley Wind Farm is a 200 MW wind power plant in Mower County, Minnesota, operated by Northern States Power Co-Minnesota, and it generated 463,604 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.8% of the generation reported in Minnesota, and its capacity factor sits at the 27th percentile of U.S. wind plants. By 2025 generation it ranks 1,425th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
26%Capacity factor, 2025, 27th percentile, on 200 MW net summer
0.8%Of MN generation, 2025
10 yearsAverage generator age, by MW

How hard does the Pleasant Valley Wind Farm plant run compared with other wind plants?

The Pleasant Valley Wind Farm plant had a capacity factor of 26% in 2025 on 200 MW of net summer capacity, the 27th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 97 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Pleasant Valley Wind Farm26%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Pleasant Valley Wind Farm plant generating more or less than last year?

Generation at Pleasant Valley Wind Farm fell 39.8% from 2024 to 2025, from 770,251 MWh to 463,604 MWh.

2 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.

Net generation by period
PeriodMWh
2024770,251
2025463,604
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202525,427
November 2025-389
October 2025-144
September 20257,597
August 202516,755
July 202522,387
June 202534,180
May 202550,049
April 202570,520
March 202583,544
February 202570,710
January 202582,968
December 202462,219
November 202473,781
October 202486,672
September 202459,291
August 202445,358
July 202435,771
June 202458,421
May 202443,668
April 202490,597
March 202483,132
February 202473,595
January 202457,746

Source: EIA Form EIA-923, through August 2026.

How much of Minnesota's electricity comes from the Pleasant Valley Wind Farm plant?

Pleasant Valley Wind Farm made 0.8% of the 58,638,010 MWh reported by Minnesota plants in 2025, from 1.0% of the state's 19,860 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 25th largest of 804 plants in Minnesota, the 1,524th largest of 14,327 in the U.S. and the 296th largest of 1,358 wind plants. By 2025 generation it is the 20th largest of 760 generating plants in the state.

Pleasant Valley Wind Farm within Minnesota, 2025
MeasureThis plantMinnesotaShare
Capacity (MW)20019,8601.0%
Generation (MWh)463,60458,638,0100.8%
Wind capacity (MW)2004,9564.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Pleasant Valley Wind Farm plant, and when do they retire?

1 operable generator totals 200 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1200100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine2002015n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Pleasant Valley Wind Farm plant?

EIA lists no joint owners for Pleasant Valley Wind Farm. Northern States Power Co-Minnesota operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Northern States Power Co - Minnesota charge homes?

Northern States Power Co - Minnesota, the operator of Pleasant Valley Wind Farm, had an average residential price of 17.07¢ per kWh and an average bill of $105 a month in 2025, 8% above the Minnesota average of 15.83¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Minnesota
Northern States Power Co - Minnesota17.07¢$1058% higher
Minnesota average15.83¢$118
U.S. average17.23¢$1519% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Pleasant Valley Wind Farm plant?

Pleasant Valley Wind Farm is in Dexter, Mower County, Minnesota, at 43.8050° N, 92.7697° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Minnesota are similar in size?

Minnesota has 121 operable wind plants with 4,956 MW of capacity, and Pleasant Valley Wind Farm's 200 MW is 4% of that.

Wind plants in Minnesota around this size
PlantCountyMW2025 MWh
Nobles Wind ProjectNobles201823,297
Prairie Rose Wind FarmRock200460,262
Odell Wind FarmCottonwood200768,536
Pleasant Valley Wind FarmMower200463,604
Blazing Star Wind Farm 1Lincoln200872,782
Red Pine Wind ProjectLincoln200773,581
Blazing Star 2 Wind FarmLincoln200865,217