Wind power plant, Minnesota
Odell Wind Farm, Minnesota
Odell Wind Farm is a 200 MW wind power plant in Cottonwood County, Minnesota, operated by Algonquin Power Co, and it generated 768,536 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.3% of the generation reported in Minnesota, and its capacity factor sits at the 87th percentile of U.S. wind plants. By 2025 generation it ranks 914th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Odell Wind Farm plant run compared with other wind plants?
The Odell Wind Farm plant had a capacity factor of 44% in 2025 on 200 MW of net summer capacity, the 87th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 160 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Odell Wind Farm | 44% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Odell Wind Farm plant generating more or less than last year?
Generation at Odell Wind Farm fell 0.6% from 2024 to 2025, from 773,060 MWh to 768,536 MWh.
| Period | MWh |
|---|---|
| 2024 | 773,060 |
| 2025 | 768,536 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 80,859 |
| November 2025 | 71,019 |
| October 2025 | 78,637 |
| September 2025 | 40,401 |
| August 2025 | 35,475 |
| July 2025 | 33,900 |
| June 2025 | 47,897 |
| May 2025 | 55,232 |
| April 2025 | 83,902 |
| March 2025 | 81,495 |
| February 2025 | 72,685 |
| January 2025 | 87,034 |
| December 2024 | 67,494 |
| November 2024 | 60,996 |
| October 2024 | 81,731 |
| September 2024 | 58,402 |
| August 2024 | 41,576 |
| July 2024 | 36,130 |
| June 2024 | 59,140 |
| May 2024 | 68,086 |
| April 2024 | 86,633 |
| March 2024 | 77,156 |
| February 2024 | 73,449 |
| January 2024 | 62,267 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Odell Wind Farm plant, and when do they retire?
1 operable generator totals 200 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 200 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Onshore Wind Turbine | 200 | 2016 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Odell Wind Farm plant?
EIA lists no joint owners for Odell Wind Farm. Algonquin Power Co operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Odell Wind Farm plant?
Odell Wind Farm is in Mountain Lake, Cottonwood County, Minnesota, at 43.8533° N, 94.9319° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Minnesota are similar in size?
Minnesota has 121 operable wind plants with 4,956 MW of capacity, and Odell Wind Farm's 200 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Bent Tree Wind Farm Phase 1 | Freeborn | 201 | 334,066 |
| Nobles Wind Project | Nobles | 201 | 823,297 |
| Prairie Rose Wind Farm | Rock | 200 | 460,262 |
| Odell Wind Farm | Cottonwood | 200 | 768,536 |
| Pleasant Valley Wind Farm | Mower | 200 | 463,604 |
| Blazing Star Wind Farm 1 | Lincoln | 200 | 872,782 |
| Red Pine Wind Project | Lincoln | 200 | 773,581 |
Source: EIA Forms EIA-860 and EIA-923, 2025.