Skip to main content
RateWatt

Other-fuel power plant, Florida

Mosaic Co Bartow Facility, Florida

Mosaic Co Bartow Facility is a 81.9 MW other-fuel power plant in Polk County, Florida, operated by Mosaic Company, and it generated 171,013 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 19th percentile of U.S. other-fuel plants. By 2025 generation it ranks 2,712th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

81.9 MWNameplate capacity
24%Capacity factor, 2025, 19th percentile, on 80 MW net summer
0.1%Of FL generation, 2025
36 yearsAverage generator age, by MW

How hard does the Mosaic Co Bartow Facility plant run compared with other other-fuel plants?

The Mosaic Co Bartow Facility plant had a capacity factor of 24% in 2025 on 80 MW of net summer capacity, the 19th percentile of the 37 U.S. other-fuel plants with at least 20 MW. The typical other-fuel plant reached 42%. That equals about 89 days at full output out of 365.

0%Shaded: the middle half of other-fuel plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Mosaic Co Bartow Facility24%
Other-fuel plants, 75th percentile56%
Other-fuel plants, median42%
Other-fuel plants, 25th percentile30%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Mosaic Co Bartow Facility plant generating more or less than last year?

Generation at Mosaic Co Bartow Facility rose 3.6% from 2024 to 2025, from 165,068 MWh to 171,013 MWh. Through August 2026 it is running 0.8% behind the same months of 2025.

Net generation by period
PeriodMWh
2024165,068
2025171,013
2026 through August126,384
2025, same months127,446
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202615,955
July 20264,393
June 20267,677
May 202611,773
April 202625,671
March 202628,724
February 202621,413
January 202610,778
December 202511,269
November 20252,071
October 202518,027
September 202512,200
August 202514,649
July 202516,471
June 202520,406
May 202523,893
April 202522,398
March 202519,405
February 20254,441
January 20255,783
December 202411,180
November 202417,195
October 202416,091
September 202413,508
August 202415,048
July 202413,023
June 202415,437
May 202410,371
April 20243,151
March 202414,923
February 202418,446
January 202416,695

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Mosaic Co Bartow Facility plant?

Mosaic Co Bartow Facility made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 78th largest of 331 plants in Florida, the 2,945th largest of 14,327 in the U.S. and the 10th largest of 71 other-fuel plants. By 2025 generation it is the 111th largest of 313 generating plants in the state.

Mosaic Co Bartow Facility within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)8279,9360.1%
Generation (MWh)171,013267,867,7350.1%
Other-fuel capacity (MW)8234723.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Mosaic Co Bartow Facility plant, and when do they retire?

2 operable generators total 81.9 MW, with an average age of 36 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1980s13745%none reported
1990s14555%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingAll Other371985n/a
GEN2OperatingAll Other451992n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Mosaic Co Bartow Facility plant?

EIA lists no joint owners for Mosaic Co Bartow Facility. Mosaic Company operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Mosaic Co Bartow Facility plant?

Mosaic Co Bartow Facility is in Bartow, Polk County, Florida, at 27.9080° N, 81.9185° W. It sits in the Tampa Electric Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which other-fuel plants in Florida are similar in size?

Florida has 5 operable other-fuel plants with 347 MW of capacity, and Mosaic Co Bartow Facility's 81.9 MW is 24% of that.

Other-fuel plants in Florida around this size
PlantCountyMW2025 MWh
Mosaic New Wales OperationsPolk136365,651
Mosaic Co Bartow FacilityPolk82171,013
Mosaic Co Tampa FacilityHillsborough7286,453

Source: EIA Forms EIA-860 and EIA-923, 2025.