Skip to main content
RateWatt

Other-fuel power plant, Florida

Mosaic Co Tampa Facility, Florida

Mosaic Co Tampa Facility is a 72.4 MW other-fuel power plant in Hillsborough County, Florida, operated by Mosaic Company, and it generated 86,453 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 8th percentile of U.S. other-fuel plants. By 2025 generation it ranks 3,563rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

72.4 MWNameplate capacity
15%Capacity factor, 2025, 8th percentile, on 68 MW net summer
3,563rdU.S. rank by generation, 2025
32 yearsAverage generator age, by MW

How hard does the Mosaic Co Tampa Facility plant run compared with other other-fuel plants?

The Mosaic Co Tampa Facility plant had a capacity factor of 15% in 2025 on 68 MW of net summer capacity, the 8th percentile of the 37 U.S. other-fuel plants with at least 20 MW. The typical other-fuel plant reached 42%. That equals about 53 days at full output out of 365.

0%Shaded: the middle half of other-fuel plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Mosaic Co Tampa Facility15%
Other-fuel plants, 75th percentile56%
Other-fuel plants, median42%
Other-fuel plants, 25th percentile30%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Mosaic Co Tampa Facility plant generating more or less than last year?

Generation at Mosaic Co Tampa Facility fell 14.3% from 2024 to 2025, from 100,866 MWh to 86,453 MWh. Through August 2026 it is running 40.6% behind the same months of 2025.

Net generation by period
PeriodMWh
2024100,866
202586,453
2026 through August34,556
2025, same months58,178
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20269,085
July 20262,719
June 20267,110
May 20263,438
April 20266,561
March 20265,016
February 2026530
January 202697
December 20253,538
November 20258,817
October 20259,518
September 20256,402
August 20258,775
July 20257,436
June 20258,951
May 20254,055
April 2025892
March 20258,693
February 202510,595
January 20258,781
December 202410,934
November 20246,966
October 20241,211
September 20248,250
August 20249,965
July 202413,152
June 202417,337
May 20244,563
April 20249,508
March 20249,159
February 20244,715
January 20245,106

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Mosaic Co Tampa Facility plant?

Mosaic Co Tampa Facility made 0.0% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 218th largest of 331 plants in Florida, the 3,309th largest of 14,327 in the U.S. and the 13th largest of 71 other-fuel plants. By 2025 generation it is the 230th largest of 313 generating plants in the state.

Mosaic Co Tampa Facility within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7279,9360.1%
Generation (MWh)86,453267,867,7350.0%
Other-fuel capacity (MW)7234720.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Mosaic Co Tampa Facility plant, and when do they retire?

2 operable generators total 72.4 MW, with an average age of 32 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1980s13852%none reported
1990s13548%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingAll Other381988n/a
GEN3OperatingAll Other351999n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Mosaic Co Tampa Facility plant?

EIA lists no joint owners for Mosaic Co Tampa Facility. Mosaic Company operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Mosaic Co Tampa Facility plant?

Mosaic Co Tampa Facility is in Riverview, Hillsborough County, Florida, at 27.8605° N, 82.3903° W. It sits in the Tampa Electric Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which other-fuel plants in Florida are similar in size?

Florida has 5 operable other-fuel plants with 347 MW of capacity, and Mosaic Co Tampa Facility's 72.4 MW is 21% of that.

Other-fuel plants in Florida around this size
PlantCountyMW2025 MWh
Mosaic New Wales OperationsPolk136365,651
Mosaic Co Bartow FacilityPolk82171,013
Mosaic Co Tampa FacilityHillsborough7286,453
Mosaic South Pierce OperationsPolk3887,532

Source: EIA Forms EIA-860 and EIA-923, 2025.