Other-fuel power plant, Florida

Mosaic South Pierce Operations power plant, Florida

Mosaic South Pierce Operations is a 38 MW other-fuel power plant in Polk County, Florida, operated by Mosaic Fertilizer LLC, and it generated 87,532 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 24th percentile of U.S. other-fuel plants. By 2025 generation it ranks 3,550th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

38 MWNameplate capacity
30%Capacity factor, 2025, 24th percentile, on 33 MW net summer
3,550thU.S. rank by generation, 2025
33 yearsAverage generator age, by MW

How hard does the Mosaic South Pierce Operations plant run compared with other other-fuel plants?

The Mosaic South Pierce Operations plant had a capacity factor of 30% in 2025 on 33 MW of net summer capacity, the 24th percentile of the 37 U.S. other-fuel plants with at least 20 MW. The typical other-fuel plant reached 42%. That equals about 111 days at full output out of 365.

0%Shaded: the middle half of other-fuel plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Mosaic South Pierce Operations30%
Other-fuel plants, 75th percentile56%
Other-fuel plants, median42%
Other-fuel plants, 25th percentile30%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Mosaic South Pierce Operations plant generating more or less than last year?

Generation at Mosaic South Pierce Operations fell 27.3% from 2024 to 2025, from 120,398 MWh to 87,532 MWh. Through August 2026 it is running 42.0% behind the same months of 2025.

Net generation by period
PeriodMWh
2024120,398
202587,532
2026 through August32,147
2025, same months55,404
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20260
July 20260
June 2026458
May 20264,389
April 20265,861
March 20264,813
February 20265,396
January 202611,230
December 202513,211
November 20255,800
October 20254,156
September 20258,961
August 20257,216
July 20257,709
June 20251,889
May 20257,600
April 20254,700
March 20256,160
February 20257,144
January 202512,986
December 202414,255
November 20246,234
October 20242,208
September 202415,287
August 202412,069
July 20249,145
June 20245,694
May 202413,454
April 20249,558
March 202411,226
February 202412,658
January 20248,610

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Mosaic South Pierce Operations plant?

Mosaic South Pierce Operations made 0.0% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.0% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 247th largest of 331 plants in Florida, the 4,170th largest of 14,327 in the U.S. and the 28th largest of 71 other-fuel plants. By 2025 generation it is the 228th largest of 313 generating plants in the state.

Mosaic South Pierce Operations within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)3879,9360.0%
Generation (MWh)87,532267,867,7350.0%
Other-fuel capacity (MW)3834711.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Mosaic South Pierce Operations plant, and when do they retire?

1 operable generator totals 38 MW, with an average age of 33 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 has already retired, totalling 7.5 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1990s138100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
TG2OperatingAll Other381992n/a
TG1RetiredAll Other819782025

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Mosaic South Pierce Operations plant?

EIA lists no joint owners for Mosaic South Pierce Operations. Mosaic Fertilizer LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Mosaic South Pierce Operations plant?

Mosaic South Pierce Operations is in Mulberry, Polk County, Florida, at 27.7652° N, 81.9388° W. It sits in the Tampa Electric Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which other-fuel plants in Florida are similar in size?

Florida has 5 operable other-fuel plants with 347 MW of capacity, and Mosaic South Pierce Operations' 38 MW is 11% of that.

Other-fuel plants in Florida around this size
PlantCountyMW2025 MWh
Mosaic Co Tampa FacilityHillsborough7286,453
Mosaic South Pierce OperationsPolk3887,532

Source: EIA Forms EIA-860 and EIA-923, 2025.