Biomass power plant, Wisconsin

Mosinee Mill biomass power plant, Wisconsin

Mosinee Mill is a 23.4 MW power plant, 20 MW of it biomass, in Marathon County, Wisconsin, operated by Ahlstrom-Munksjo NA Specialty Solutions, LLC, and it generated 117,962 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Wisconsin, and its capacity factor sits at the 43rd percentile of U.S. biomass plants. By 2025 generation it ranks 3,222nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

23.4 MWNameplate capacity
44%Capacity factor, 2025, biomass units, 43rd percentile, on 18 MW net summer
0.2%Of WI generation, 2025
62 yearsAverage generator age, by MW

How hard does the Mosinee Mill plant run compared with other biomass plants?

The Mosinee Mill plant's biomass units had a capacity factor of 44% in 2025 on 18 MW of net summer capacity, the 43rd percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 162 days at full output out of 365.

0%Shaded: the middle half of biomass plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Mosinee Mill44%
Biomass plants, 75th percentile65%
Biomass plants, median48%
Biomass plants, 25th percentile35%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its biomass generators only. Values above 105% are left out of the comparison.

Is the Mosinee Mill plant generating more or less than last year?

Generation at Mosinee Mill fell 4.0% from 2024 to 2025, from 122,929 MWh to 117,962 MWh. Through August 2026 it is running 39.6% behind the same months of 2025.

Net generation by period
PeriodMWh
2024122,929
2025117,962
2026 through August46,901
2025, same months77,686
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20262,887
July 20263,087
June 20265,610
May 20267,311
April 202611,374
March 20268,609
February 20264,006
January 20264,017
December 202511,223
November 202510,857
October 20258,832
September 20259,364
August 202510,328
July 20257,773
June 20257,482
May 20259,010
April 202510,482
March 202511,526
February 202510,001
January 202511,084
December 202410,457
November 202411,025
October 20249,221
September 202410,041
August 20249,575
July 202410,643
June 202410,554
May 202411,221
April 20248,764
March 202410,323
February 202410,001
January 202411,104

Source: EIA Form EIA-923, through August 2026.

How much of Wisconsin's electricity comes from the Mosinee Mill plant?

Mosinee Mill made 0.2% of the 66,249,756 MWh reported by Wisconsin plants in 2025, from 0.1% of the state's 19,442 MW of capacity. Its share of output is 1.5 times its share of capacity. By capacity it is the 79th largest of 273 plants in Wisconsin, the 4,633rd largest of 14,327 in the U.S. and the 180th largest of 585 biomass plants on its biomass units alone. By 2025 generation it is the 50th largest of 259 generating plants in the state.

Mosinee Mill within Wisconsin, 2025
MeasureThis plantWisconsinShare
Capacity (MW)2319,4420.1%
Generation (MWh)117,96266,249,7560.2%
Biomass capacity (MW)202099.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Mosinee Mill plant, and when do they retire?

5 operable generators total 23.4 MW, with an average age of 62 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1910s215%none reported
1920s129%none reported
1950s1521%none reported
1970s11564%none reported
Every generator, 5 in all
UnitStatusTechnologyMWIn servicePlanned retirement
HYD2OperatingConventional Hydroelectric11916n/a
HYD3OperatingConventional Hydroelectric11916n/a
HYD1OperatingConventional Hydroelectric21924n/a
WESTOperatingWood/Wood Waste Biomass51951n/a
GEN1OperatingWood/Wood Waste Biomass151976n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Mosinee Mill plant?

EIA lists no joint owners for Mosinee Mill. Ahlstrom-Munksjo NA Specialty Solutions, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Mosinee Mill plant use?

Mosinee Mill has capacity on 2 fuels: 85% biomass and 15% hydro. In 2025, biomass made 59% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Biomass2085.5%69,968
Hydro314.5%14,694

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Mosinee Mill plant?

Mosinee Mill is in Mosinee, Marathon County, Wisconsin, at 44.7881° N, 89.6917° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which biomass plants in Wisconsin are similar in size?

Wisconsin has 19 operable biomass plants with 209 MW of capacity, and Mosinee Mill's 20 MW is 10% of that.

Biomass plants in Wisconsin around this size
PlantCountyMW2025 MWh
Mosinee MillMarathon2069,968
Packaging of America Tomahawk MillLincoln1661,170
Omega Hills Gas RecoveryWashington1379,186