Coal power plant, Iowa
Muscatine Plant #1 coal power plant, Iowa
Muscatine Plant #1 is a 276 MW coal power plant in Muscatine County, Iowa, operated by Board of Water Electric & Communications, and it generated 748,125 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.0% of the generation reported in Iowa, and its capacity factor sits at the 22nd percentile of U.S. coal plants. By 2025 generation it ranks 940th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Muscatine Plant #1 plant run compared with other coal plants?
The Muscatine Plant #1 plant had a capacity factor of 34% in 2025 on 249 MW of net summer capacity, the 22nd percentile of the 181 U.S. coal plants with at least 20 MW. The typical coal plant reached 49%. That equals about 125 days at full output out of 365.
0%Shaded: the middle half of coal plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Muscatine Plant #1 | 34% |
| Coal plants, 75th percentile | 63% |
| Coal plants, median | 49% |
| Coal plants, 25th percentile | 37% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Muscatine Plant #1 plant generating more or less than last year?
Muscatine Plant #1 generated 748,125 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 6.6% behind the same months of 2025. 2024 has output for only 10 months, so the two years are not compared.
2 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.
| Period | MWh |
|---|---|
| 2024 | 551,879 |
| 2025 | 748,125 |
| 2026 through August | 480,179 |
| 2025, same months | 514,155 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 61,542 |
| July 2026 | 86,298 |
| June 2026 | 56,377 |
| May 2026 | 47,185 |
| April 2026 | 28,208 |
| March 2026 | 30,396 |
| February 2026 | 76,495 |
| January 2026 | 93,678 |
| December 2025 | 85,483 |
| November 2025 | 69,584 |
| October 2025 | 15,712 |
| September 2025 | 63,191 |
| August 2025 | 58,844 |
| July 2025 | 117,918 |
| June 2025 | 78,916 |
| May 2025 | 54,599 |
| April 2025 | 34,998 |
| March 2025 | 25,196 |
| February 2025 | 71,841 |
| January 2025 | 71,843 |
| December 2024 | 73,567 |
| November 2024 | 60,620 |
| October 2024 | 12,129 |
| September 2024 | 72,116 |
| August 2024 | 78,186 |
| July 2024 | 75,300 |
| June 2024 | 67,150 |
| May 2024 | 55,281 |
| April 2024 | -710 |
| March 2024 | -1,522 |
| February 2024 | 2,085 |
| January 2024 | 57,677 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Muscatine Plant #1 plant, and when do they retire?
3 operable generators total 276 MW, with an average age of 48 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 more is proposed, totalling 35 MW. 1 has already retired, totalling 18 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1950s | 1 | 25 | 9% | none reported |
| 1960s | 1 | 75 | 27% | none reported |
| 1980s | 1 | 176 | 64% | none reported |
Every generator, 5 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 7 | Operating | Conventional Steam Coal | 25 | 1958 | n/a |
| 8 | Operating | Conventional Steam Coal | 75 | 1969 | n/a |
| 9 | Operating | Conventional Steam Coal | 176 | 1983 | n/a |
| 10 | Approved, not started | Natural Gas Fired Combustion Turbine | 35 | 2027 | n/a |
| 8A | Retired | Conventional Steam Coal | 18 | 2000 | 2024 |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Muscatine Plant #1 plant?
EIA lists no joint owners for Muscatine Plant #1. Board of Water Electric & Communications operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does Board of Water Electric & Communications charge homes?
Board of Water Electric & Communications, the operator of Muscatine Plant #1, had an average residential price of 12.89¢ per kWh and an average bill of $107 a month in 2025, 5% below the Iowa average of 13.62¢.
| Measure | Price | Monthly bill | Against Iowa |
|---|---|---|---|
| Board of Water Electric & Communications | 12.89¢ | $107 | 5% lower |
| Iowa average | 13.62¢ | $117 | |
| U.S. average | 17.23¢ | $151 | 26% higher |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
Where is the Muscatine Plant #1 plant?
Muscatine Plant #1 is in Muscatine, Muscatine County, Iowa, at 41.3917° N, 91.0569° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which coal plants in Iowa are similar in size?
Iowa has 8 operable coal plants with 5,178 MW of capacity, and Muscatine Plant #1's 276 MW is 5% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Muscatine Plant #1 | Muscatine | 276 | 746,107 |
| Archer Daniels Midland Cedar Rapids | Linn | 256 | 746,440 |
| Archer Daniels Midland Clinton | Clinton | 180 | 661,396 |
Source: EIA Forms EIA-860 and EIA-923, 2025.