Coal power plant, Iowa

Muscatine Plant #1 coal power plant, Iowa

Muscatine Plant #1 is a 276 MW coal power plant in Muscatine County, Iowa, operated by Board of Water Electric & Communications, and it generated 748,125 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.0% of the generation reported in Iowa, and its capacity factor sits at the 22nd percentile of U.S. coal plants. By 2025 generation it ranks 940th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

276 MWNameplate capacity
34%Capacity factor, 2025, 22nd percentile, on 249 MW net summer
1.0%Of IA generation, 2025
48 yearsAverage generator age, by MW

How hard does the Muscatine Plant #1 plant run compared with other coal plants?

The Muscatine Plant #1 plant had a capacity factor of 34% in 2025 on 249 MW of net summer capacity, the 22nd percentile of the 181 U.S. coal plants with at least 20 MW. The typical coal plant reached 49%. That equals about 125 days at full output out of 365.

0%Shaded: the middle half of coal plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Muscatine Plant #134%
Coal plants, 75th percentile63%
Coal plants, median49%
Coal plants, 25th percentile37%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Muscatine Plant #1 plant generating more or less than last year?

Muscatine Plant #1 generated 748,125 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 6.6% behind the same months of 2025. 2024 has output for only 10 months, so the two years are not compared.

2 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.

Net generation by period
PeriodMWh
2024551,879
2025748,125
2026 through August480,179
2025, same months514,155
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202661,542
July 202686,298
June 202656,377
May 202647,185
April 202628,208
March 202630,396
February 202676,495
January 202693,678
December 202585,483
November 202569,584
October 202515,712
September 202563,191
August 202558,844
July 2025117,918
June 202578,916
May 202554,599
April 202534,998
March 202525,196
February 202571,841
January 202571,843
December 202473,567
November 202460,620
October 202412,129
September 202472,116
August 202478,186
July 202475,300
June 202467,150
May 202455,281
April 2024-710
March 2024-1,522
February 20242,085
January 202457,677

Source: EIA Form EIA-923, through August 2026.

How much of Iowa's electricity comes from the Muscatine Plant #1 plant?

Muscatine Plant #1 made 1.0% of the 74,502,373 MWh reported by Iowa plants in 2025, from 1.1% of the state's 24,817 MW of capacity. By capacity it is the 22nd largest of 306 plants in Iowa, the 1,160th largest of 14,327 in the U.S. and the 138th largest of 195 coal plants. By 2025 generation it is the 30th largest of 283 generating plants in the state.

Muscatine Plant #1 within Iowa, 2025
MeasureThis plantIowaShare
Capacity (MW)27624,8171.1%
Generation (MWh)748,12574,502,3731.0%
Coal capacity (MW)2765,1785.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Muscatine Plant #1 plant, and when do they retire?

3 operable generators total 276 MW, with an average age of 48 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 more is proposed, totalling 35 MW. 1 has already retired, totalling 18 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1950s1259%none reported
1960s17527%none reported
1980s117664%none reported
Every generator, 5 in all
UnitStatusTechnologyMWIn servicePlanned retirement
7OperatingConventional Steam Coal251958n/a
8OperatingConventional Steam Coal751969n/a
9OperatingConventional Steam Coal1761983n/a
10Approved, not startedNatural Gas Fired Combustion Turbine352027n/a
8ARetiredConventional Steam Coal1820002024

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Muscatine Plant #1 plant?

EIA lists no joint owners for Muscatine Plant #1. Board of Water Electric & Communications operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Board of Water Electric & Communications charge homes?

Board of Water Electric & Communications, the operator of Muscatine Plant #1, had an average residential price of 12.89¢ per kWh and an average bill of $107 a month in 2025, 5% below the Iowa average of 13.62¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Iowa
Board of Water Electric & Communications12.89¢$1075% lower
Iowa average13.62¢$117
U.S. average17.23¢$15126% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Muscatine Plant #1 plant?

Muscatine Plant #1 is in Muscatine, Muscatine County, Iowa, at 41.3917° N, 91.0569° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which coal plants in Iowa are similar in size?

Iowa has 8 operable coal plants with 5,178 MW of capacity, and Muscatine Plant #1's 276 MW is 5% of that.

Coal plants in Iowa around this size
PlantCountyMW2025 MWh
Muscatine Plant #1Muscatine276746,107
Archer Daniels Midland Cedar RapidsLinn256746,440
Archer Daniels Midland ClintonClinton180661,396

Source: EIA Forms EIA-860 and EIA-923, 2025.