Skip to main content
RateWatt

Solar power plant, Alabama

Muscle Shoals solar power plant, Alabama

Muscle Shoals is a 227 MW solar power plant in Colbert County, Alabama, operated by Muscle Shoals Solar, LLC, and it generated 426,583 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Alabama, and its capacity factor sits at the 36th percentile of U.S. solar plants. By 2025 generation it ranks 1,513th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

227 MWNameplate capacity
21%Capacity factor, 2025, 36th percentile, on 227 MW net summer
0.3%Of AL generation, 2025
4 yearsAverage generator age, by MW

How hard does the Muscle Shoals plant run compared with other solar plants?

The Muscle Shoals plant had a capacity factor of 21% in 2025 on 227 MW of net summer capacity, the 36th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 78 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Muscle Shoals21%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Muscle Shoals plant generating more or less than last year?

Generation at Muscle Shoals rose 0.5% from 2024 to 2025, from 424,372 MWh to 426,583 MWh. Through August 2026 it is running 0.6% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024424,372
2025426,583
2026 through August309,707
2025, same months307,989
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202649,586
July 202643,832
June 202648,105
May 202644,925
April 202647,002
March 202629,742
February 202626,394
January 202620,121
December 202517,716
November 202524,536
October 202535,553
September 202540,789
August 202546,289
July 202553,973
June 202544,796
May 202537,290
April 202541,925
March 202535,993
February 202523,732
January 202523,991
December 202418,871
November 202422,818
October 202440,744
September 202433,025
August 202452,972
July 202444,506
June 202449,492
May 202445,322
April 202437,819
March 202434,568
February 202426,516
January 202417,719

Source: EIA Form EIA-923, through August 2026.

How much of Alabama's electricity comes from the Muscle Shoals plant?

Muscle Shoals made 0.3% of the 141,699,034 MWh reported by Alabama plants in 2025, from 0.7% of the state's 32,890 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 23rd largest of 78 plants in Alabama, the 1,376th largest of 14,327 in the U.S. and the 124th largest of 7,223 solar plants. By 2025 generation it is the 29th largest of 74 generating plants in the state.

Muscle Shoals within Alabama, 2025
MeasureThis plantAlabamaShare
Capacity (MW)22732,8900.7%
Generation (MWh)426,583141,699,0340.3%
Solar capacity (MW)22774630.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Muscle Shoals plant, and when do they retire?

1 operable generator totals 227 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1227100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN01OperatingSolar Photovoltaic2272021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Muscle Shoals plant?

EIA lists no joint owners for Muscle Shoals. Muscle Shoals Solar, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Muscle Shoals plant?

Muscle Shoals is in Cherokee, Colbert County, Alabama, at 34.7697° N, 87.9045° W. It sits in the Tennessee Valley Authority balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.