Hydro power plant, California
Narrows 2 hydroelectric power plant, California
Narrows 2 is a 46.7 MW hydro power plant in Yuba County, California, operated by Yuba County Water Agency-(CA), and it generated 181,159 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 61st percentile of U.S. hydro plants. By 2025 generation it ranks 2,633rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Narrows 2 plant run compared with other hydro plants?
The Narrows 2 plant had a capacity factor of 38% in 2025 on 55 MW of net summer capacity, the 61st percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 137 days at full output out of 365.
0%Shaded: the middle half of hydro plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Narrows 2 | 38% |
| Hydro plants, 75th percentile | 44% |
| Hydro plants, median | 33% |
| Hydro plants, 25th percentile | 22% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Narrows 2 plant generating more or less than last year?
Generation at Narrows 2 rose 15.5% from 2024 to 2025, from 156,848 MWh to 181,159 MWh.
| Period | MWh |
|---|---|
| 2024 | 156,848 |
| 2025 | 181,159 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 11,816 |
| November 2025 | 2,828 |
| October 2025 | 2,960 |
| September 2025 | 3,147 |
| August 2025 | 14,272 |
| July 2025 | 21,235 |
| June 2025 | 29,391 |
| May 2025 | 36,149 |
| April 2025 | 20,309 |
| March 2025 | 2,117 |
| February 2025 | 32,800 |
| January 2025 | 4,135 |
| December 2024 | 4,034 |
| November 2024 | 3,054 |
| October 2024 | 3,238 |
| September 2024 | 69 |
| August 2024 | 16,619 |
| July 2024 | 20,175 |
| June 2024 | 15,221 |
| May 2024 | 6,738 |
| April 2024 | 32,324 |
| March 2024 | 32,401 |
| February 2024 | 20,114 |
| January 2024 | 2,861 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Narrows 2 plant, and when do they retire?
1 operable generator totals 46.7 MW, with an average age of 56 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1960s | 1 | 47 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Conventional Hydroelectric | 47 | 1969 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Narrows 2 plant?
EIA lists no joint owners for Narrows 2. Yuba County Water Agency-(CA) operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Narrows 2 plant?
Narrows 2 is in Browns Valley, Yuba County, California, at 39.2390° N, 121.2704° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which hydro plants in California are similar in size?
California has 238 operable hydro plants with 9,936 MW of capacity, and Narrows 2's 46.7 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Tiger Creek | Amador | 52 | 215,708 |
| Drum 1 | Placer | 49 | 15,101 |
| Kings River PH | Fresno | 49 | 80,771 |
| Narrows 2 | Yuba | 47 | 181,159 |
| San Francisquito 2 | Los Angeles | 46 | 33,663 |
| Chicago Park | Nevada | 44 | 65,178 |
| Salt Springs | Amador | 42 | 113,368 |
Source: EIA Forms EIA-860 and EIA-923, 2025.