Hydro power plant, California

San Francisquito 2 hydroelectric power plant, California

San Francisquito 2 is a 46 MW hydro power plant in Los Angeles County, California, operated by Los Angeles Department of Water & Power, and it generated 33,663 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 5th percentile of U.S. hydro plants. By 2025 generation it ranks 4,587th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

46 MWNameplate capacity
9%Capacity factor, 2025, 5th percentile, on 44.9 MW net summer
4,587thU.S. rank by generation, 2025
100 yearsAverage generator age, by MW

How hard does the San Francisquito 2 plant run compared with other hydro plants?

The San Francisquito 2 plant had a capacity factor of 9% in 2025 on 44.9 MW of net summer capacity, the 5th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 31 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
San Francisquito 29%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the San Francisquito 2 plant generating more or less than last year?

San Francisquito 2 generated 33,663 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 11 months, so the two years are not compared.

2 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.

Net generation by period
PeriodMWh
202444,654
202533,663
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20251,871
November 2025-19
October 2025-15
September 20251,807
August 20255,736
July 20256,766
June 20255,474
May 20257,216
April 2025150
March 20251,852
February 20252,821
January 20254
December 20241,088
November 20242,258
October 20241,595
September 20240
August 20246,442
July 20246,756
June 20245,844
May 20245,339
April 20245,994
March 20242,327
February 20243,734
January 20243,277

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the San Francisquito 2 plant?

San Francisquito 2 made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 471st largest of 1,877 plants in California, the 3,951st largest of 14,327 in the U.S. and the 273rd largest of 1,393 hydro plants. By 2025 generation it is the 569th largest of 1,608 generating plants in the state.

San Francisquito 2 within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)46107,4330.0%
Generation (MWh)33,663204,542,8980.0%
Hydro capacity (MW)469,9360.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the San Francisquito 2 plant, and when do they retire?

3 operable generators total 46 MW, with an average age of 100 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1920s22861%none reported
1930s11839%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1Out of serviceConventional Hydroelectric141920n/a
2OperatingConventional Hydroelectric141920n/a
3OperatingConventional Hydroelectric181932n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the San Francisquito 2 plant?

EIA lists no joint owners for San Francisquito 2. Los Angeles Department of Water & Power operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Los Angeles Department of Water & Power charge homes?

Los Angeles Department of Water & Power, the operator of San Francisquito 2, had an average residential price of 26.48¢ per kWh and an average bill of $124 a month in 2025, 16% below the California average of 31.35¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst California
Los Angeles Department of Water & Power26.48¢$12416% lower
California average31.35¢$155
U.S. average17.23¢$15145% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the San Francisquito 2 plant?

San Francisquito 2 is in Saugus, Los Angeles County, California, at 34.5343° N, 118.5251° W. It sits in the Los Angeles Department of Water and Power balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in California are similar in size?

California has 238 operable hydro plants with 9,936 MW of capacity, and San Francisquito 2's 46 MW is 0% of that.

Hydro plants in California around this size
PlantCountyMW2025 MWh
Drum 1Placer4915,101
Kings River PHFresno4980,771
Narrows 2Yuba47181,159
San Francisquito 2Los Angeles4633,663
Chicago ParkNevada4465,178
Salt SpringsAmador42113,368
ForbestownButte42114,901

Source: EIA Forms EIA-860 and EIA-923, 2025.