Neptune Energy Center Hybrid is a 450 MW power plant, 325 MW of it solar, in Pueblo County, Colorado, operated by Neptune Energy Center, LLC, and it generated 679,256 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.2% of the generation reported in Colorado, and its capacity factor sits at the 60th percentile of U.S. solar plants. By 2025 generation it ranks 1,016th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

450 MWNameplate capacity
24%Capacity factor, 2025, solar units, 60th percentile, on 325 MW net summer
1.2%Of CO generation, 2025
2 yearsAverage generator age, by MW

How hard does the Neptune Energy Center Hybrid plant run compared with other solar plants?

The Neptune Energy Center Hybrid plant's solar units had a capacity factor of 24% in 2025 on 325 MW of net summer capacity, the 60th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 89 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Neptune Energy Center Hybrid24%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Neptune Energy Center Hybrid plant generating more or less than last year?

Generation at Neptune Energy Center Hybrid fell 1.1% from 2024 to 2025, from 686,915 MWh to 679,256 MWh. Through August 2026 it is running 11.9% behind the same months of 2025.

Net generation by period
PeriodMWh
2024686,915
2025679,256
2026 through August431,811
2025, same months490,373
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202663,824
July 202680,539
June 202660,892
May 202652,190
April 202646,636
March 202653,854
February 202641,955
January 202631,921
December 202531,917
November 202537,599
October 202553,370
September 202565,997
August 202573,588
July 202584,087
June 202581,196
May 202563,145
April 202553,473
March 202559,208
February 202540,481
January 202535,195
December 202436,618
November 202434,683
October 202449,449
September 202462,179
August 202473,517
July 202479,522
June 202475,405
May 202469,417
April 202467,730
March 202460,151
February 202444,253
January 202433,991

Source: EIA Form EIA-923, through August 2026.

How much of Colorado's electricity comes from the Neptune Energy Center Hybrid plant?

Neptune Energy Center Hybrid made 1.2% of the 55,830,894 MWh reported by Colorado plants in 2025, from 2.0% of the state's 22,712 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 12th largest of 321 plants in Colorado, the 793rd largest of 14,327 in the U.S. and the 28th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 21st largest of 292 generating plants in the state.

Neptune Energy Center Hybrid within Colorado, 2025
MeasureThis plantColoradoShare
Capacity (MW)45022,7122.0%
Generation (MWh)679,25655,830,8941.2%
Solar capacity (MW)3253,26310.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Neptune Energy Center Hybrid plant, and when do they retire?

2 operable generators total 450 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2450100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
NT125OperatingBatteries1252023n/a
NT325OperatingSolar Photovoltaic3252023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Neptune Energy Center Hybrid plant?

EIA lists no joint owners for Neptune Energy Center Hybrid. Neptune Energy Center, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Neptune Energy Center Hybrid plant use?

Neptune Energy Center Hybrid has capacity on 2 fuels: 72% solar and 28% battery and pumped storage. In 2025, solar made 103% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar32572.2%696,486
Battery and pumped storage12527.8%-17,230

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Neptune Energy Center Hybrid plant?

Neptune Energy Center Hybrid is in Boone, Pueblo County, Colorado, at 38.3303° N, 104.4142° W. It sits in the Public Service Company of Colorado balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Colorado are similar in size?

Colorado has 181 operable solar plants with 3,263 MW of capacity, and Neptune Energy Center Hybrid's 325 MW is 10% of that.

Solar plants in Colorado around this size
PlantCountyMW2025 MWh
Neptune Energy Center HybridPueblo325696,486
Rocky Mountain SolarPueblo3253,092
Thunder Wolf Energy Center HybridPueblo248560,059
Bighorn Solar 1Pueblo240582,531

Source: EIA Forms EIA-860 and EIA-923, 2025.