Thunder Wolf Energy Center Hybrid solar power plant, Colorado

Thunder Wolf Energy Center Hybrid is a 348 MW power plant, 248 MW of it solar, in Pueblo County, Colorado, operated by Thunder Wolf Energy Center, LLC, and it generated 543,742 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.0% of the generation reported in Colorado, and its capacity factor sits at the 70th percentile of U.S. solar plants. By 2025 generation it ranks 1,261st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

348 MWNameplate capacity
26%Capacity factor, 2025, solar units, 70th percentile, on 248 MW net summer
1.0%Of CO generation, 2025
2 yearsAverage generator age, by MW

How hard does the Thunder Wolf Energy Center Hybrid plant run compared with other solar plants?

The Thunder Wolf Energy Center Hybrid plant's solar units had a capacity factor of 26% in 2025 on 248 MW of net summer capacity, the 70th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 94 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Thunder Wolf Energy Center Hybrid26%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Thunder Wolf Energy Center Hybrid plant generating more or less than last year?

Generation at Thunder Wolf Energy Center Hybrid fell 3.8% from 2024 to 2025, from 565,312 MWh to 543,742 MWh. Through August 2026 it is running 13.6% behind the same months of 2025.

Net generation by period
PeriodMWh
2024565,312
2025543,742
2026 through August340,706
2025, same months394,129
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202652,196
July 202665,301
June 202647,485
May 202642,347
April 202636,651
March 202641,495
February 202630,748
January 202624,483
December 202525,525
November 202529,718
October 202541,168
September 202553,202
August 202559,222
July 202566,517
June 202561,862
May 202554,082
April 202542,490
March 202548,115
February 202532,406
January 202529,435
December 202429,703
November 202427,387
October 202440,940
September 202451,343
August 202461,623
July 202465,314
June 202460,507
May 202455,322
April 202454,690
March 202452,500
February 202437,339
January 202428,644

Source: EIA Form EIA-923, through August 2026.

How much of Colorado's electricity comes from the Thunder Wolf Energy Center Hybrid plant?

Thunder Wolf Energy Center Hybrid made 1.0% of the 55,830,894 MWh reported by Colorado plants in 2025, from 1.5% of the state's 22,712 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 17th largest of 321 plants in Colorado, the 937th largest of 14,327 in the U.S. and the 109th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 33rd largest of 292 generating plants in the state.

Thunder Wolf Energy Center Hybrid within Colorado, 2025
MeasureThis plantColoradoShare
Capacity (MW)34822,7121.5%
Generation (MWh)543,74255,830,8941.0%
Solar capacity (MW)2483,2637.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Thunder Wolf Energy Center Hybrid plant, and when do they retire?

2 operable generators total 348 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2348100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
TW100OperatingBatteries1002023n/a
TW300OperatingSolar Photovoltaic2482023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Thunder Wolf Energy Center Hybrid plant?

EIA lists no joint owners for Thunder Wolf Energy Center Hybrid. Thunder Wolf Energy Center, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Thunder Wolf Energy Center Hybrid plant use?

Thunder Wolf Energy Center Hybrid has capacity on 2 fuels: 71% solar and 29% battery and pumped storage. In 2025, solar made 103% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar24871.3%560,059
Battery and pumped storage10028.7%-16,317

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Thunder Wolf Energy Center Hybrid plant?

Thunder Wolf Energy Center Hybrid is in Avondale, Pueblo County, Colorado, at 38.1899° N, 104.3980° W. It sits in the Public Service Company of Colorado balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Colorado are similar in size?

Colorado has 181 operable solar plants with 3,263 MW of capacity, and Thunder Wolf Energy Center Hybrid's 248 MW is 8% of that.

Solar plants in Colorado around this size
PlantCountyMW2025 MWh
Neptune Energy Center HybridPueblo325696,486
Rocky Mountain SolarPueblo3253,092
Thunder Wolf Energy Center HybridPueblo248560,059
Bighorn Solar 1Pueblo240582,531
Sun Mountain Solar 1Pueblo200448,228
Pike Solar HybridEl Paso175446,179

Source: EIA Forms EIA-860 and EIA-923, 2025.