Skip to main content
RateWatt

Solar power plant, Colorado

Pike Solar Hybrid power plant, Colorado

Pike Solar Hybrid is a 175 MW solar power plant in El Paso County, Colorado, operated by Deriva Energy, and it generated 446,179 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.8% of the generation reported in Colorado, and its capacity factor sits at the 87th percentile of U.S. solar plants. By 2025 generation it ranks 1,464th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

175 MWNameplate capacity
29%Capacity factor, 2025, 87th percentile, on 175 MW net summer
0.8%Of CO generation, 2025
2 yearsAverage generator age, by MW

How hard does the Pike Solar Hybrid plant run compared with other solar plants?

The Pike Solar Hybrid plant had a capacity factor of 29% in 2025 on 175 MW of net summer capacity, the 87th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 106 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Pike Solar Hybrid29%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Pike Solar Hybrid plant generating more or less than last year?

Generation at Pike Solar Hybrid rose 3.5% from 2024 to 2025, from 431,013 MWh to 446,179 MWh. Through August 2026 it is running 1.3% behind the same months of 2025.

Net generation by period
PeriodMWh
2024431,013
2025446,179
2026 through August314,910
2025, same months318,904
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202639,135
July 202650,682
June 202657,833
May 202656,436
April 202613,844
March 202639,171
February 202631,178
January 202626,631
December 202522,790
November 202525,239
October 202535,413
September 202543,833
August 202539,761
July 202544,343
June 202548,209
May 202543,705
April 202543,382
March 202541,094
February 202531,178
January 202527,232
December 202424,087
November 202427,506
October 202437,001
September 202441,205
August 202435,967
July 202439,225
June 202442,506
May 202450,315
April 202442,882
March 202436,664
February 202429,495
January 202424,160

Source: EIA Form EIA-923, through August 2026.

How much of Colorado's electricity comes from the Pike Solar Hybrid plant?

Pike Solar Hybrid made 0.8% of the 55,830,894 MWh reported by Colorado plants in 2025, from 0.8% of the state's 22,712 MW of capacity. By capacity it is the 41st largest of 321 plants in Colorado, the 1,781st largest of 14,327 in the U.S. and the 223rd largest of 7,223 solar plants. By 2025 generation it is the 37th largest of 292 generating plants in the state.

Pike Solar Hybrid within Colorado, 2025
MeasureThis plantColoradoShare
Capacity (MW)17522,7120.8%
Generation (MWh)446,17955,830,8940.8%
Solar capacity (MW)1753,2635.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Pike Solar Hybrid plant, and when do they retire?

1 operable generator totals 175 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1175100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CO465OperatingSolar Photovoltaic1752023n/a
PSBESPostponed indefinitelyBatteries25n/an/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Pike Solar Hybrid plant?

Pike Solar, LLC is the only joint owner reported for Pike Solar Hybrid, with 100.0%. Deriva Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Pike Solar Hybrid plant?

Pike Solar Hybrid is in Fountain, El Paso County, Colorado, at 38.6217° N, 104.5814° W. It sits in the Public Service Company of Colorado balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Colorado are similar in size?

Colorado has 181 operable solar plants with 3,263 MW of capacity, and Pike Solar Hybrid's 175 MW is 5% of that.

Solar plants in Colorado around this size
PlantCountyMW2025 MWh
Thunder Wolf Energy Center HybridPueblo248560,059
Bighorn Solar 1Pueblo240582,531
Sun Mountain Solar 1Pueblo200448,228
Pike Solar HybridEl Paso175446,179
Black Hollow SunWeld150114,700
Axial Basin SolarMoffat14547,132
Spanish Peaks SolarLas Animas140344,231

Source: EIA Forms EIA-860 and EIA-923, 2025.