Solar power plant, Colorado
Pike Solar Hybrid power plant, Colorado
Pike Solar Hybrid is a 175 MW solar power plant in El Paso County, Colorado, operated by Deriva Energy, and it generated 446,179 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.8% of the generation reported in Colorado, and its capacity factor sits at the 87th percentile of U.S. solar plants. By 2025 generation it ranks 1,464th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Pike Solar Hybrid plant run compared with other solar plants?
The Pike Solar Hybrid plant had a capacity factor of 29% in 2025 on 175 MW of net summer capacity, the 87th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 106 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Pike Solar Hybrid | 29% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Pike Solar Hybrid plant generating more or less than last year?
Generation at Pike Solar Hybrid rose 3.5% from 2024 to 2025, from 431,013 MWh to 446,179 MWh. Through August 2026 it is running 1.3% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 431,013 |
| 2025 | 446,179 |
| 2026 through August | 314,910 |
| 2025, same months | 318,904 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 39,135 |
| July 2026 | 50,682 |
| June 2026 | 57,833 |
| May 2026 | 56,436 |
| April 2026 | 13,844 |
| March 2026 | 39,171 |
| February 2026 | 31,178 |
| January 2026 | 26,631 |
| December 2025 | 22,790 |
| November 2025 | 25,239 |
| October 2025 | 35,413 |
| September 2025 | 43,833 |
| August 2025 | 39,761 |
| July 2025 | 44,343 |
| June 2025 | 48,209 |
| May 2025 | 43,705 |
| April 2025 | 43,382 |
| March 2025 | 41,094 |
| February 2025 | 31,178 |
| January 2025 | 27,232 |
| December 2024 | 24,087 |
| November 2024 | 27,506 |
| October 2024 | 37,001 |
| September 2024 | 41,205 |
| August 2024 | 35,967 |
| July 2024 | 39,225 |
| June 2024 | 42,506 |
| May 2024 | 50,315 |
| April 2024 | 42,882 |
| March 2024 | 36,664 |
| February 2024 | 29,495 |
| January 2024 | 24,160 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Pike Solar Hybrid plant, and when do they retire?
1 operable generator totals 175 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 175 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CO465 | Operating | Solar Photovoltaic | 175 | 2023 | n/a |
| PSBES | Postponed indefinitely | Batteries | 25 | n/a | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Pike Solar Hybrid plant?
Pike Solar, LLC is the only joint owner reported for Pike Solar Hybrid, with 100.0%. Deriva Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Pike Solar Hybrid plant?
Pike Solar Hybrid is in Fountain, El Paso County, Colorado, at 38.6217° N, 104.5814° W. It sits in the Public Service Company of Colorado balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Colorado are similar in size?
Colorado has 181 operable solar plants with 3,263 MW of capacity, and Pike Solar Hybrid's 175 MW is 5% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Thunder Wolf Energy Center Hybrid | Pueblo | 248 | 560,059 |
| Bighorn Solar 1 | Pueblo | 240 | 582,531 |
| Sun Mountain Solar 1 | Pueblo | 200 | 448,228 |
| Pike Solar Hybrid | El Paso | 175 | 446,179 |
| Black Hollow Sun | Weld | 150 | 114,700 |
| Axial Basin Solar | Moffat | 145 | 47,132 |
| Spanish Peaks Solar | Las Animas | 140 | 344,231 |
Source: EIA Forms EIA-860 and EIA-923, 2025.