Solar power plant, Colorado
Spanish Peaks Solar power plant, Colorado
Spanish Peaks Solar is a 140 MW solar power plant in Las Animas County, Colorado, operated by Spanish Peaks Solar LLC, and it generated 344,231 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in Colorado, and its capacity factor sits at the 83rd percentile of U.S. solar plants. By 2025 generation it ranks 1,797th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Spanish Peaks Solar plant run compared with other solar plants?
The Spanish Peaks Solar plant had a capacity factor of 28% in 2025 on 140 MW of net summer capacity, the 83rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 102 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Spanish Peaks Solar | 28% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Spanish Peaks Solar plant generating more or less than last year?
Spanish Peaks Solar generated 344,231 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 6.0% behind the same months of 2025. 2024 has output for only 1 month, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 4,289 |
| 2025 | 344,231 |
| 2026 through August | 231,380 |
| 2025, same months | 246,252 |
Monthly generation, Dec 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 6,019 |
| July 2026 | 37,758 |
| June 2026 | 39,571 |
| May 2026 | 28,323 |
| April 2026 | 37,729 |
| March 2026 | 32,640 |
| February 2026 | 26,974 |
| January 2026 | 22,366 |
| December 2025 | 19,461 |
| November 2025 | 18,570 |
| October 2025 | 28,966 |
| September 2025 | 30,982 |
| August 2025 | 34,418 |
| July 2025 | 37,374 |
| June 2025 | 37,102 |
| May 2025 | 36,580 |
| April 2025 | 36,269 |
| March 2025 | 29,303 |
| February 2025 | 21,904 |
| January 2025 | 13,302 |
| December 2024 | 4,289 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Spanish Peaks Solar plant, and when do they retire?
1 operable generator totals 140 MW, with an average age of 1 year weighted by capacity at the end of 2025. 140 MW, 100% of operable capacity, has a planned retirement, the first in 2058.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 140 | 100% | 2058 |
| Year | Units | MW retiring | Share of plant |
|---|---|---|---|
| 2058 | 1 | 140 | 100% |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 47301 | Operating | Solar Photovoltaic | 140 | 2024 | 2058 |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Spanish Peaks Solar plant?
EIA lists no joint owners for Spanish Peaks Solar. Spanish Peaks Solar LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Spanish Peaks Solar plant?
Spanish Peaks Solar is in Trinidad, Las Animas County, Colorado, at 37.3780° N, 104.4750° W. It sits in the Public Service Company of Colorado balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Colorado are similar in size?
Colorado has 181 operable solar plants with 3,263 MW of capacity, and Spanish Peaks Solar's 140 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Pike Solar Hybrid | El Paso | 175 | 446,179 |
| Black Hollow Sun | Weld | 150 | 114,700 |
| Axial Basin Solar | Moffat | 145 | 47,132 |
| Spanish Peaks Solar | Las Animas | 140 | 344,231 |
| Comanche Solar | Pueblo | 120 | 227,746 |
| Dolores Canyon Solar | Dolores | 110 | 21,452 |
| Pioneer Solar (CO), LLC | Adams | 80 | 179,753 |
Source: EIA Forms EIA-860 and EIA-923, 2025.