Solar power plant, Colorado
Pioneer Solar (CO), LLC power plant, Colorado
Pioneer Solar (CO), LLC is a 80 MW solar power plant in Adams County, Colorado, operated by Pioneer Solar (CO), LLC, and it generated 179,753 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Colorado, and its capacity factor sits at the 69th percentile of U.S. solar plants. By 2025 generation it ranks 2,648th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Pioneer Solar (CO), LLC plant run compared with other solar plants?
The Pioneer Solar (CO), LLC plant had a capacity factor of 26% in 2025 on 80 MW of net summer capacity, the 69th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 94 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Pioneer Solar (CO), LLC | 26% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Pioneer Solar (CO), LLC plant generating more or less than last year?
Generation at Pioneer Solar (CO), LLC fell 9.1% from 2024 to 2025, from 197,677 MWh to 179,753 MWh. Through August 2026 it is running 1.8% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 197,677 |
| 2025 | 179,753 |
| 2026 through August | 128,560 |
| 2025, same months | 130,949 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 19,758 |
| July 2026 | 20,959 |
| June 2026 | 20,061 |
| May 2026 | 15,684 |
| April 2026 | 15,245 |
| March 2026 | 15,640 |
| February 2026 | 11,287 |
| January 2026 | 9,926 |
| December 2025 | 8,580 |
| November 2025 | 10,257 |
| October 2025 | 14,569 |
| September 2025 | 15,398 |
| August 2025 | 16,876 |
| July 2025 | 19,354 |
| June 2025 | 20,274 |
| May 2025 | 15,331 |
| April 2025 | 18,318 |
| March 2025 | 17,688 |
| February 2025 | 12,331 |
| January 2025 | 10,777 |
| December 2024 | 9,063 |
| November 2024 | 8,915 |
| October 2024 | 16,130 |
| September 2024 | 19,724 |
| August 2024 | 20,486 |
| July 2024 | 23,394 |
| June 2024 | 21,898 |
| May 2024 | 21,643 |
| April 2024 | 15,814 |
| March 2024 | 16,419 |
| February 2024 | 12,994 |
| January 2024 | 11,197 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Pioneer Solar (CO), LLC plant, and when do they retire?
1 operable generator totals 80 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 80 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| PI-QF | Operating | Solar Photovoltaic | 80 | 2021 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Pioneer Solar (CO), LLC plant?
EIA lists no joint owners for Pioneer Solar (CO), LLC. Pioneer Solar (CO), LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Pioneer Solar (CO), LLC plant?
Pioneer Solar (CO), LLC is in Bennett, Adams County, Colorado, at 39.7616° N, 104.4590° W. It sits in the Public Service Company of Colorado balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Colorado are similar in size?
Colorado has 181 operable solar plants with 3,263 MW of capacity, and Pioneer Solar (CO), LLC's 80 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Spanish Peaks Solar | Las Animas | 140 | 344,231 |
| Comanche Solar | Pueblo | 120 | 227,746 |
| Dolores Canyon Solar | Dolores | 110 | 21,452 |
| Pioneer Solar (CO), LLC | Adams | 80 | 179,753 |
| Garnet Mesa Solar | Delta | 80 | 75,003 |
| Hunter Solar, LLC (CO) | Arapahoe | 75 | 198,138 |
| Palmer Solar | El Paso | 60 | 140,246 |
Source: EIA Forms EIA-860 and EIA-923, 2025.