Solar power plant, Colorado

Palmer Solar power plant, Colorado

Palmer Solar is a 60 MW solar power plant in El Paso County, Colorado, operated by Deriva Energy, and it generated 140,246 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Colorado, and its capacity factor sits at the 76th percentile of U.S. solar plants. By 2025 generation it ranks 3,006th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

60 MWNameplate capacity
27%Capacity factor, 2025, 76th percentile, on 60 MW net summer
0.3%Of CO generation, 2025
5 yearsAverage generator age, by MW

How hard does the Palmer Solar plant run compared with other solar plants?

The Palmer Solar plant had a capacity factor of 27% in 2025 on 60 MW of net summer capacity, the 76th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 97 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Palmer Solar27%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Palmer Solar plant generating more or less than last year?

Generation at Palmer Solar fell 5.2% from 2024 to 2025, from 147,998 MWh to 140,246 MWh. Through August 2026 it is running 0.5% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024147,998
2025140,246
2026 through August98,775
2025, same months98,283
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202614,078
July 202617,479
June 202617,911
May 202615,796
April 20263,669
March 202613,652
February 20267,585
January 20268,605
December 20257,423
November 20258,936
October 202511,877
September 202513,727
August 202512,534
July 202514,772
June 202515,707
May 202514,417
April 202513,227
March 202512,136
February 20257,585
January 20257,905
December 20247,643
November 20248,461
October 202411,787
September 202414,240
August 202413,714
July 202415,817
June 202415,140
May 202416,732
April 202413,839
March 202413,480
February 20249,367
January 20247,778

Source: EIA Form EIA-923, through August 2026.

How much of Colorado's electricity comes from the Palmer Solar plant?

Palmer Solar made 0.3% of the 55,830,894 MWh reported by Colorado plants in 2025, from 0.3% of the state's 22,712 MW of capacity. By capacity it is the 73rd largest of 321 plants in Colorado, the 3,517th largest of 14,327 in the U.S. and the 809th largest of 7,223 solar plants. By 2025 generation it is the 59th largest of 292 generating plants in the state.

Palmer Solar within Colorado, 2025
MeasureThis plantColoradoShare
Capacity (MW)6022,7120.3%
Generation (MWh)140,24655,830,8940.3%
Solar capacity (MW)603,2631.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Palmer Solar plant, and when do they retire?

1 operable generator totals 60 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s160100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
20181OperatingSolar Photovoltaic602020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Palmer Solar plant?

Palmer Solar, LLC is the only joint owner reported for Palmer Solar, with 100.0%. Deriva Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Palmer Solar plant?

Palmer Solar is in Fountain, El Paso County, Colorado, at 38.6299° N, 104.6526° W. It sits in the Western Area Power Administration - Rocky Mountain Region balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Colorado are similar in size?

Colorado has 181 operable solar plants with 3,263 MW of capacity, and Palmer Solar's 60 MW is 2% of that.

Solar plants in Colorado around this size
PlantCountyMW2025 MWh
Pioneer Solar (CO), LLCAdams80179,753
Garnet Mesa SolarDelta8075,003
Hunter Solar, LLC (CO)Arapahoe75198,138
Palmer SolarEl Paso60140,246
Hooper SolarAlamosa52121,919
Titan SolarArapahoe5097,371
San Luis Valley Solar RanchAlamosa3565,951

Source: EIA Forms EIA-860 and EIA-923, 2025.