Titan Solar is a 50 MW solar power plant in Arapahoe County, Colorado, operated by Titan Solar, LLC, and it generated 97,371 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Colorado, and its capacity factor sits at the 43rd percentile of U.S. solar plants. By 2025 generation it ranks 3,427th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

50 MWNameplate capacity
22%Capacity factor, 2025, 43rd percentile, on 50 MW net summer
0.2%Of CO generation, 2025
7 yearsAverage generator age, by MW

How hard does the Titan Solar plant run compared with other solar plants?

The Titan Solar plant had a capacity factor of 22% in 2025 on 50 MW of net summer capacity, the 43rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 81 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Titan Solar22%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Titan Solar plant generating more or less than last year?

Generation at Titan Solar rose 0.4% from 2024 to 2025, from 96,963 MWh to 97,371 MWh. Through August 2026 it is running 0.7% ahead of the same months of 2025.

Net generation by period
PeriodMWh
202496,963
202597,371
2026 through August71,100
2025, same months70,628
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202611,822
July 202614,230
June 202612,192
May 20269,981
April 20267,259
March 20267,807
February 20264,339
January 20263,470
December 20254,110
November 20255,526
October 20257,650
September 20259,457
August 202511,758
July 202512,527
June 202511,500
May 20259,740
April 20257,020
March 20258,618
February 20255,056
January 20254,409
December 20244,483
November 20245,160
October 20246,735
September 20249,927
August 202410,765
July 202412,349
June 202411,014
May 20249,253
April 20247,545
March 20248,503
February 20245,361
January 20245,868

Source: EIA Form EIA-923, through August 2026.

How much of Colorado's electricity comes from the Titan Solar plant?

Titan Solar made 0.2% of the 55,830,894 MWh reported by Colorado plants in 2025, from 0.2% of the state's 22,712 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 80th largest of 321 plants in Colorado, the 3,754th largest of 14,327 in the U.S. and the 883rd largest of 7,223 solar plants. By 2025 generation it is the 70th largest of 292 generating plants in the state.

Titan Solar within Colorado, 2025
MeasureThis plantColoradoShare
Capacity (MW)5022,7120.2%
Generation (MWh)97,37155,830,8940.2%
Solar capacity (MW)503,2631.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Titan Solar plant, and when do they retire?

1 operable generator totals 50 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s150100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PCECOperatingSolar Photovoltaic502018n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Titan Solar plant?

EIA lists no joint owners for Titan Solar. Titan Solar, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Titan Solar plant?

Titan Solar is in Deer Trail, Arapahoe County, Colorado, at 39.6865° N, 104.0140° W. It sits in the Public Service Company of Colorado balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Colorado are similar in size?

Colorado has 181 operable solar plants with 3,263 MW of capacity, and Titan Solar's 50 MW is 2% of that.

Solar plants in Colorado around this size
PlantCountyMW2025 MWh
Hunter Solar, LLC (CO)Arapahoe75198,138
Palmer SolarEl Paso60140,246
Hooper SolarAlamosa52121,919
Titan SolarArapahoe5097,371
San Luis Valley Solar RanchAlamosa3565,951
Grazing Yak SolarEl Paso3577,339
Alamosa SolarAlamosa3076,560

Source: EIA Forms EIA-860 and EIA-923, 2025.