Solar power plant, Colorado

Alamosa Solar power plant, Colorado

Alamosa Solar is a 30 MW solar power plant in Alamosa County, Colorado, operated by Solar of Alamosa LLC, and it generated 76,560 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Colorado, and its capacity factor sits at the 88th percentile of U.S. solar plants. By 2025 generation it ranks 3,691st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

30 MWNameplate capacity
29%Capacity factor, 2025, 88th percentile, on 30 MW net summer
0.1%Of CO generation, 2025
13 yearsAverage generator age, by MW

How hard does the Alamosa Solar plant run compared with other solar plants?

The Alamosa Solar plant had a capacity factor of 29% in 2025 on 30 MW of net summer capacity, the 88th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 106 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Alamosa Solar29%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Alamosa Solar plant generating more or less than last year?

Alamosa Solar generated 76,560 MWh in 2025; EIA reports no 2024 total to compare.

Net generation by period
PeriodMWh
2024n/a
202576,560
Monthly generation, Jan 2025 to Dec 2025
MonthMWh
December 20254,828
November 20254,971
October 20256,252
September 20256,262
August 20257,174
July 20257,571
June 20258,008
May 20258,178
April 20257,354
March 20256,247
February 20255,375
January 20254,340

Source: EIA Form EIA-923, through August 2026.

How much of Colorado's electricity comes from the Alamosa Solar plant?

Alamosa Solar made 0.1% of the 55,830,894 MWh reported by Colorado plants in 2025, from 0.1% of the state's 22,712 MW of capacity. By capacity it is the 88th largest of 321 plants in Colorado, the 4,354th largest of 14,327 in the U.S. and the 1,012th largest of 7,223 solar plants. By 2025 generation it is the 73rd largest of 292 generating plants in the state.

Alamosa Solar within Colorado, 2025
MeasureThis plantColoradoShare
Capacity (MW)3022,7120.1%
Generation (MWh)76,56055,830,8940.1%
Solar capacity (MW)303,2630.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Alamosa Solar plant, and when do they retire?

1 operable generator totals 30 MW, with an average age of 13 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s130100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic302012n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Alamosa Solar plant?

Alamosa Enhanced, LLC is the only joint owner reported for Alamosa Solar, with 100.0%. Solar of Alamosa LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Alamosa Solar plant?

Alamosa Solar is in Mosca, Alamosa County, Colorado, at 37.5986° N, 105.9558° W. It sits in the Public Service Company of Colorado balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Colorado are similar in size?

Colorado has 181 operable solar plants with 3,263 MW of capacity, and Alamosa Solar's 30 MW is 1% of that.

Solar plants in Colorado around this size
PlantCountyMW2025 MWh
Titan SolarArapahoe5097,371
San Luis Valley Solar RanchAlamosa3565,951
Grazing Yak SolarEl Paso3577,339
Alamosa SolarAlamosa3076,560
San Isabel Solar, LLCLas Animas3069,342
Bison Solar LLCLarimer3059,136
Rawhide Prairie Solar HybridLarimer2245,020

Source: EIA Forms EIA-860 and EIA-923, 2025.