Solar power plant, Colorado
Rawhide Prairie Solar Hybrid power plant, Colorado
Rawhide Prairie Solar Hybrid is a 23 MW power plant, 22 MW of it solar, in Larimer County, Colorado, operated by Greenbacker Renewable Energy Corporation, and it generated 44,944 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Colorado, and its capacity factor sits at the 52nd percentile of U.S. solar plants. By 2025 generation it ranks 4,223rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Rawhide Prairie Solar Hybrid plant run compared with other solar plants?
The Rawhide Prairie Solar Hybrid plant's solar units had a capacity factor of 23% in 2025 on 22 MW of net summer capacity, the 52nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 85 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Rawhide Prairie Solar Hybrid | 23% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Rawhide Prairie Solar Hybrid plant generating more or less than last year?
Generation at Rawhide Prairie Solar Hybrid rose 2.8% from 2024 to 2025, from 43,701 MWh to 44,944 MWh.
| Period | MWh |
|---|---|
| 2024 | 43,701 |
| 2025 | 44,944 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 1,900 |
| November 2025 | 2,532 |
| October 2025 | 3,823 |
| September 2025 | 4,584 |
| August 2025 | 4,711 |
| July 2025 | 4,894 |
| June 2025 | 5,185 |
| May 2025 | 4,255 |
| April 2025 | 4,230 |
| March 2025 | 3,932 |
| February 2025 | 2,892 |
| January 2025 | 2,006 |
| December 2024 | 1,415 |
| November 2024 | 1,895 |
| October 2024 | 3,268 |
| September 2024 | 4,370 |
| August 2024 | 4,819 |
| July 2024 | 4,516 |
| June 2024 | 5,516 |
| May 2024 | 5,328 |
| April 2024 | 4,307 |
| March 2024 | 4,124 |
| February 2024 | 2,931 |
| January 2024 | 1,212 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Rawhide Prairie Solar Hybrid plant, and when do they retire?
2 operable generators total 23 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 23 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| BA1 | Operating | Batteries | 1 | 2021 | n/a |
| PV1 | Operating | Solar Photovoltaic | 22 | 2021 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Rawhide Prairie Solar Hybrid plant?
EIA lists no joint owners for Rawhide Prairie Solar Hybrid. Greenbacker Renewable Energy Corporation operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Rawhide Prairie Solar Hybrid plant use?
Rawhide Prairie Solar Hybrid has capacity on 2 fuels: 96% solar and 4% battery and pumped storage. In 2025, solar made 100% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 22 | 95.7% | 45,020 |
| Battery and pumped storage | 1 | 4.3% | -76 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Rawhide Prairie Solar Hybrid plant?
Rawhide Prairie Solar Hybrid is in Wellington, Larimer County, Colorado, at 40.8580° N, 105.0156° W. It sits in the Public Service Company of Colorado balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Colorado are similar in size?
Colorado has 181 operable solar plants with 3,263 MW of capacity, and Rawhide Prairie Solar Hybrid's 22 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Alamosa Solar | Alamosa | 30 | 76,560 |
| San Isabel Solar, LLC | Las Animas | 30 | 69,342 |
| Bison Solar LLC | Larimer | 30 | 59,136 |
| Rawhide Prairie Solar Hybrid | Larimer | 22 | 45,020 |
| Greater Sandhill I | Alamosa | 19 | n/a |
| SR Platte Solar Farm | Weld | 16 | 33,874 |
| SR Jenkins Ft Lupton | Weld | 13 | 30,671 |
Source: EIA Forms EIA-860 and EIA-923, 2025.