Rawhide Prairie Solar Hybrid is a 23 MW power plant, 22 MW of it solar, in Larimer County, Colorado, operated by Greenbacker Renewable Energy Corporation, and it generated 44,944 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Colorado, and its capacity factor sits at the 52nd percentile of U.S. solar plants. By 2025 generation it ranks 4,223rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

23 MWNameplate capacity
23%Capacity factor, 2025, solar units, 52nd percentile, on 22 MW net summer
0.1%Of CO generation, 2025
4 yearsAverage generator age, by MW

How hard does the Rawhide Prairie Solar Hybrid plant run compared with other solar plants?

The Rawhide Prairie Solar Hybrid plant's solar units had a capacity factor of 23% in 2025 on 22 MW of net summer capacity, the 52nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 85 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Rawhide Prairie Solar Hybrid23%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Rawhide Prairie Solar Hybrid plant generating more or less than last year?

Generation at Rawhide Prairie Solar Hybrid rose 2.8% from 2024 to 2025, from 43,701 MWh to 44,944 MWh.

Net generation by period
PeriodMWh
202443,701
202544,944
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20251,900
November 20252,532
October 20253,823
September 20254,584
August 20254,711
July 20254,894
June 20255,185
May 20254,255
April 20254,230
March 20253,932
February 20252,892
January 20252,006
December 20241,415
November 20241,895
October 20243,268
September 20244,370
August 20244,819
July 20244,516
June 20245,516
May 20245,328
April 20244,307
March 20244,124
February 20242,931
January 20241,212

Source: EIA Form EIA-923, through August 2026.

How much of Colorado's electricity comes from the Rawhide Prairie Solar Hybrid plant?

Rawhide Prairie Solar Hybrid made 0.1% of the 55,830,894 MWh reported by Colorado plants in 2025, from 0.1% of the state's 22,712 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 96th largest of 321 plants in Colorado, the 4,644th largest of 14,327 in the U.S. and the 1,069th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 84th largest of 292 generating plants in the state.

Rawhide Prairie Solar Hybrid within Colorado, 2025
MeasureThis plantColoradoShare
Capacity (MW)2322,7120.1%
Generation (MWh)44,94455,830,8940.1%
Solar capacity (MW)223,2630.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Rawhide Prairie Solar Hybrid plant, and when do they retire?

2 operable generators total 23 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s223100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BA1OperatingBatteries12021n/a
PV1OperatingSolar Photovoltaic222021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Rawhide Prairie Solar Hybrid plant?

EIA lists no joint owners for Rawhide Prairie Solar Hybrid. Greenbacker Renewable Energy Corporation operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Rawhide Prairie Solar Hybrid plant use?

Rawhide Prairie Solar Hybrid has capacity on 2 fuels: 96% solar and 4% battery and pumped storage. In 2025, solar made 100% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar2295.7%45,020
Battery and pumped storage14.3%-76

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Rawhide Prairie Solar Hybrid plant?

Rawhide Prairie Solar Hybrid is in Wellington, Larimer County, Colorado, at 40.8580° N, 105.0156° W. It sits in the Public Service Company of Colorado balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Colorado are similar in size?

Colorado has 181 operable solar plants with 3,263 MW of capacity, and Rawhide Prairie Solar Hybrid's 22 MW is 1% of that.

Solar plants in Colorado around this size
PlantCountyMW2025 MWh
Alamosa SolarAlamosa3076,560
San Isabel Solar, LLCLas Animas3069,342
Bison Solar LLCLarimer3059,136
Rawhide Prairie Solar HybridLarimer2245,020
Greater Sandhill IAlamosa19n/a
SR Platte Solar FarmWeld1633,874
SR Jenkins Ft LuptonWeld1330,671