San Isabel Solar, LLC power plant, Colorado

San Isabel Solar, LLC is a 30 MW solar power plant in Las Animas County, Colorado, operated by San Isabel Solar, LLC, and it generated 69,342 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Colorado, and its capacity factor sits at the 73rd percentile of U.S. solar plants. By 2025 generation it ranks 3,765th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

30 MWNameplate capacity
26%Capacity factor, 2025, 73rd percentile, on 30 MW net summer
0.1%Of CO generation, 2025
9 yearsAverage generator age, by MW

How hard does the San Isabel Solar, LLC plant run compared with other solar plants?

The San Isabel Solar, LLC plant had a capacity factor of 26% in 2025 on 30 MW of net summer capacity, the 73rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 96 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
San Isabel Solar, LLC26%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the San Isabel Solar, LLC plant generating more or less than last year?

Generation at San Isabel Solar, LLC fell 8.6% from 2024 to 2025, from 75,890 MWh to 69,342 MWh. Through August 2026 it is running 4.9% behind the same months of 2025.

Net generation by period
PeriodMWh
202475,890
202569,342
2026 through August48,823
2025, same months51,321
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20265,908
July 20267,632
June 20266,509
May 20266,438
April 20267,184
March 20266,294
February 20265,123
January 20263,735
December 20253,354
November 20253,676
October 20255,375
September 20255,616
August 20256,145
July 20257,336
June 20257,236
May 20257,492
April 20257,287
March 20256,576
February 20255,002
January 20254,247
December 20243,882
November 20244,351
October 20245,864
September 20246,643
August 20246,916
July 20248,190
June 20247,765
May 20248,526
April 20247,392
March 20246,779
February 20245,245
January 20244,337

Source: EIA Form EIA-923, through August 2026.

How much of Colorado's electricity comes from the San Isabel Solar, LLC plant?

San Isabel Solar, LLC made 0.1% of the 55,830,894 MWh reported by Colorado plants in 2025, from 0.1% of the state's 22,712 MW of capacity. By capacity it is the 88th largest of 321 plants in Colorado, the 4,354th largest of 14,327 in the U.S. and the 1,023rd largest of 7,223 solar plants. By 2025 generation it is the 77th largest of 292 generating plants in the state.

San Isabel Solar, LLC within Colorado, 2025
MeasureThis plantColoradoShare
Capacity (MW)3022,7120.1%
Generation (MWh)69,34255,830,8940.1%
Solar capacity (MW)303,2630.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the San Isabel Solar, LLC plant, and when do they retire?

1 operable generator totals 30 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s130100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
SISPVOperatingSolar Photovoltaic302016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the San Isabel Solar, LLC plant?

EIA lists no joint owners for San Isabel Solar, LLC. San Isabel Solar, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the San Isabel Solar, LLC plant?

San Isabel Solar, LLC is in Trinidad, Las Animas County, Colorado, at 37.3720° N, 104.8430° W. It sits in the Public Service Company of Colorado balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Colorado are similar in size?

Colorado has 181 operable solar plants with 3,263 MW of capacity, and San Isabel Solar, LLC's 30 MW is 1% of that.

Solar plants in Colorado around this size
PlantCountyMW2025 MWh
San Luis Valley Solar RanchAlamosa3565,951
Grazing Yak SolarEl Paso3577,339
Alamosa SolarAlamosa3076,560
San Isabel Solar, LLCLas Animas3069,342
Bison Solar LLCLarimer3059,136
Rawhide Prairie Solar HybridLarimer2245,020
Greater Sandhill IAlamosa19n/a

Source: EIA Forms EIA-860 and EIA-923, 2025.