Skip to main content
RateWatt

Solar power plant, Colorado

Comanche Solar power plant, Colorado

Comanche Solar is a 120 MW solar power plant in Pueblo County, Colorado, operated by Onward Energy, and it generated 227,746 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Colorado, and its capacity factor sits at the 38th percentile of U.S. solar plants. By 2025 generation it ranks 2,329th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

120 MWNameplate capacity
22%Capacity factor, 2025, 38th percentile, on 120 MW net summer
0.4%Of CO generation, 2025
9 yearsAverage generator age, by MW

How hard does the Comanche Solar plant run compared with other solar plants?

The Comanche Solar plant had a capacity factor of 22% in 2025 on 120 MW of net summer capacity, the 38th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 79 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Comanche Solar22%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Comanche Solar plant generating more or less than last year?

Generation at Comanche Solar fell 6.1% from 2024 to 2025, from 242,478 MWh to 227,746 MWh. Through August 2026 it is running 17.5% behind the same months of 2025.

Net generation by period
PeriodMWh
2024242,478
2025227,746
2026 through August136,458
2025, same months165,461
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202622,304
July 202629,878
June 202617,909
May 202617,223
April 202613,157
March 202616,135
February 202610,761
January 20269,091
December 202510,643
November 202512,815
October 202515,841
September 202522,986
August 202526,835
July 202530,935
June 202528,896
May 202519,227
April 202517,434
March 202518,350
February 202512,012
January 202511,772
December 202412,496
November 202412,523
October 202416,979
September 202423,760
August 202427,181
July 202430,358
June 202427,780
May 202421,776
April 202418,116
March 202420,929
February 202415,813
January 202414,767

Source: EIA Form EIA-923, through August 2026.

How much of Colorado's electricity comes from the Comanche Solar plant?

Comanche Solar made 0.4% of the 55,830,894 MWh reported by Colorado plants in 2025, from 0.5% of the state's 22,712 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 56th largest of 321 plants in Colorado, the 2,315th largest of 14,327 in the U.S. and the 377th largest of 7,223 solar plants. By 2025 generation it is the 48th largest of 292 generating plants in the state.

Comanche Solar within Colorado, 2025
MeasureThis plantColoradoShare
Capacity (MW)12022,7120.5%
Generation (MWh)227,74655,830,8940.4%
Solar capacity (MW)1203,2633.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Comanche Solar plant, and when do they retire?

1 operable generator totals 120 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
COMCHOperatingSolar Photovoltaic1202016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Comanche Solar plant?

EIA lists no joint owners for Comanche Solar. Onward Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Comanche Solar plant?

Comanche Solar is in Pueblo, Pueblo County, Colorado, at 38.2053° N, 104.5667° W. It sits in the Public Service Company of Colorado balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Colorado are similar in size?

Colorado has 181 operable solar plants with 3,263 MW of capacity, and Comanche Solar's 120 MW is 4% of that.

Solar plants in Colorado around this size
PlantCountyMW2025 MWh
Black Hollow SunWeld150114,700
Axial Basin SolarMoffat14547,132
Spanish Peaks SolarLas Animas140344,231
Comanche SolarPueblo120227,746
Dolores Canyon SolarDolores11021,452
Pioneer Solar (CO), LLCAdams80179,753
Garnet Mesa SolarDelta8075,003

Source: EIA Forms EIA-860 and EIA-923, 2025.