Solar power plant, Colorado
Axial Basin Solar power plant, Colorado
Axial Basin Solar is a 145 MW solar power plant in Moffat County, Colorado, operated by Tri-State G & T Assn, Inc, and it generated 47,132 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Colorado, and its capacity factor sits at the 4th percentile of U.S. solar plants. By 2025 generation it ranks 4,168th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Axial Basin Solar plant run compared with other solar plants?
The Axial Basin Solar plant had a capacity factor of 4% in 2025 on 145 MW of net summer capacity, the 4th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 14 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Axial Basin Solar | 4% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Axial Basin Solar plant generating more or less than last year?
Axial Basin Solar generated 47,132 MWh in 2025; EIA reports no 2024 total to compare.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 47,132 |
| 2026 through August | 249,733 |
Monthly generation, Oct 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 36,308 |
| July 2026 | 40,349 |
| June 2026 | 41,525 |
| May 2026 | 31,920 |
| April 2026 | 27,146 |
| March 2026 | 32,324 |
| February 2026 | 21,307 |
| January 2026 | 18,854 |
| December 2025 | 13,512 |
| November 2025 | 17,866 |
| October 2025 | 15,754 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Axial Basin Solar plant, and when do they retire?
1 operable generator totals 145 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 145 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CO505 | Operating | Solar Photovoltaic | 145 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Axial Basin Solar plant?
EIA lists no joint owners for Axial Basin Solar. Tri-State G & T Assn, Inc operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Axial Basin Solar plant?
Axial Basin Solar is in Meeker, Moffat County, Colorado, at 40.3279° N, 107.7533° W. It sits in the Public Service Company of Colorado balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Colorado are similar in size?
Colorado has 181 operable solar plants with 3,263 MW of capacity, and Axial Basin Solar's 145 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Sun Mountain Solar 1 | Pueblo | 200 | 448,228 |
| Pike Solar Hybrid | El Paso | 175 | 446,179 |
| Black Hollow Sun | Weld | 150 | 114,700 |
| Axial Basin Solar | Moffat | 145 | 47,132 |
| Spanish Peaks Solar | Las Animas | 140 | 344,231 |
| Comanche Solar | Pueblo | 120 | 227,746 |
| Dolores Canyon Solar | Dolores | 110 | 21,452 |
Source: EIA Forms EIA-860 and EIA-923, 2025.