Natural gas power plant, California

New-Indy Ontario Mill natural gas power plant, California

New-Indy Ontario Mill is a 33 MW natural gas power plant in San Bernardino County, California, operated by New-Indy Ontario LLC, and it generated 244,749 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 99th percentile of U.S. natural gas plants. By 2025 generation it ranks 2,256th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

33 MWNameplate capacity
95%Capacity factor, 2025, 99th percentile, on 29.4 MW net summer
0.1%Of CA generation, 2025
6 yearsAverage generator age, by MW

How hard does the New-Indy Ontario Mill plant run compared with other natural gas plants?

The New-Indy Ontario Mill plant had a capacity factor of 95% in 2025 on 29.4 MW of net summer capacity, the 99th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 347 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
New-Indy Ontario Mill95%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the New-Indy Ontario Mill plant generating more or less than last year?

Generation at New-Indy Ontario Mill fell 0.5% from 2024 to 2025, from 245,944 MWh to 244,749 MWh. Through August 2026 it is running 0.7% behind the same months of 2025.

Net generation by period
PeriodMWh
2024245,944
2025244,749
2026 through August161,090
2025, same months162,233
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202620,189
July 202620,731
June 202617,287
May 202621,087
April 202619,917
March 202621,291
February 202618,976
January 202621,612
December 202521,323
November 202520,473
October 202521,102
September 202519,618
August 202520,539
July 202521,078
June 202520,653
May 202521,179
April 202519,638
March 202518,867
February 202518,949
January 202521,330
December 202421,993
November 202420,204
October 202421,189
September 202418,900
August 202420,864
July 202420,556
June 202420,385
May 202421,964
April 202421,131
March 202419,879
February 202417,291
January 202421,588

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the New-Indy Ontario Mill plant?

New-Indy Ontario Mill made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. Its share of output is 3.9 times its share of capacity. By capacity it is the 533rd largest of 1,877 plants in California, the 4,279th largest of 14,327 in the U.S. and the 1,192nd largest of 1,962 natural gas plants. By 2025 generation it is the 225th largest of 1,608 generating plants in the state.

New-Indy Ontario Mill within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)33107,4330.0%
Generation (MWh)244,749204,542,8980.1%
Natural gas capacity (MW)3340,2110.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the New-Indy Ontario Mill plant, and when do they retire?

2 operable generators total 33 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 has already retired, totalling 34 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s233100%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN2OperatingNatural Gas Fired Combustion Turbine172019n/a
GEN3OperatingNatural Gas Fired Combustion Turbine172019n/a
GEN1RetiredNatural Gas Fired Combustion Turbine3419852019

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the New-Indy Ontario Mill plant?

EIA lists no joint owners for New-Indy Ontario Mill. New-Indy Ontario LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the New-Indy Ontario Mill plant?

New-Indy Ontario Mill is in Ontario, San Bernardino County, California, at 34.0454° N, 117.5402° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in California are similar in size?

California has 304 operable natural gas plants with 40,211 MW of capacity, and New-Indy Ontario Mill's 33 MW is 0% of that.

Natural gas plants in California around this size
PlantCountyMW2025 MWh
Chula Vista Energy CenterSan Diego37373
Kingsburg CogenFresno364,044
Valero Wilmington Cogeneration PlantLos Angeles34211,339
New-Indy Ontario MillSan Bernardino33244,749
University of California San Diego HybriSan Diego33206,785
Agnews Power PlantSanta Clara328,576
CSUCI Site AuthorityVentura310

Source: EIA Forms EIA-860 and EIA-923, 2025.