Natural gas power plant, California
University of California San Diego Hybri natural gas power plant, California
University of California San Diego Hybri is a 33 MW natural gas power plant in San Diego County, California, operated by University of California San Diego, and it generated 206,760 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 92nd percentile of U.S. natural gas plants. By 2025 generation it ranks 2,444th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the University of California San Diego Hybri plant run compared with other natural gas plants?
The University of California San Diego Hybri plant had a capacity factor of 79% in 2025 on 30 MW of net summer capacity, the 92nd percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 287 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| University of California San Diego Hybri | 79% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the University of California San Diego Hybri plant generating more or less than last year?
Generation at University of California San Diego Hybri fell 6.8% from 2024 to 2025, from 221,927 MWh to 206,760 MWh. Through August 2026 it is running 14.2% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 221,927 |
| 2025 | 206,760 |
| 2026 through August | 153,555 |
| 2025, same months | 134,477 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 19,469 |
| July 2026 | 14,881 |
| June 2026 | 19,980 |
| May 2026 | 19,036 |
| April 2026 | 19,916 |
| March 2026 | 21,049 |
| February 2026 | 18,589 |
| January 2026 | 20,635 |
| December 2025 | 17,941 |
| November 2025 | 16,559 |
| October 2025 | 19,537 |
| September 2025 | 18,246 |
| August 2025 | 20,285 |
| July 2025 | 20,242 |
| June 2025 | 20,068 |
| April 2025 | 17,195 |
| March 2025 | 19,206 |
| February 2025 | 17,969 |
| January 2025 | 19,512 |
| December 2024 | 16,460 |
| November 2024 | 19,294 |
| October 2024 | 16,963 |
| September 2024 | 16,601 |
| August 2024 | 19,202 |
| July 2024 | 19,807 |
| June 2024 | 16,789 |
| May 2024 | 20,058 |
| April 2024 | 18,504 |
| March 2024 | 20,233 |
| February 2024 | 18,790 |
| January 2024 | 19,226 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the University of California San Diego Hybri plant, and when do they retire?
3 operable generators total 33 MW, with an average age of 24 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 has already retired, totalling 2.5 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 3 | 33 | 100% | none reported |
Every generator, 4 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| NT2 | Operating | Natural Gas Fired Combined Cycle | 15 | 2001 | n/a |
| ST1 | Operating | Natural Gas Fired Combined Cycle | 15 | 2001 | n/a |
| STG | Operating | Natural Gas Fired Combined Cycle | 3 | 2001 | n/a |
| BS1 | Retired | Batteries | 3 | 2015 | 2025 |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the University of California San Diego Hybri plant?
EIA lists no joint owners for University of California San Diego Hybri. University of California San Diego operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the University of California San Diego Hybri plant?
University of California San Diego Hybri is in La Jolla, San Diego County, California, at 32.8747° N, 117.2392° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in California are similar in size?
California has 304 operable natural gas plants with 40,211 MW of capacity, and University of California San Diego Hybri's 33 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Kingsburg Cogen | Fresno | 36 | 4,044 |
| Valero Wilmington Cogeneration Plant | Los Angeles | 34 | 211,339 |
| New-Indy Ontario Mill | San Bernardino | 33 | 244,749 |
| University of California San Diego Hybri | San Diego | 33 | 206,785 |
| Agnews Power Plant | Santa Clara | 32 | 8,576 |
| CSUCI Site Authority | Ventura | 31 | 0 |
| Linde Wilmington | Los Angeles | 31 | 0 |
Source: EIA Forms EIA-860 and EIA-923, 2025.