Skip to main content
RateWatt

Biomass power plant, Arizona

Novo BioPower Plant, Arizona

Novo BioPower Plant is a 27.2 MW biomass power plant in Navajo County, Arizona, operated by Novo Biopower LLC, and it generated 202,323 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Arizona, and its capacity factor sits at the 99th percentile of U.S. biomass plants. By 2025 generation it ranks 2,476th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

27.2 MWNameplate capacity
104%Capacity factor, 2025, 99th percentile, on 22.2 MW net summer
0.2%Of AZ generation, 2025
17 yearsAverage generator age, by MW

How hard does Novo BioPower Plant run compared with other biomass plants?

Novo BioPower Plant had a capacity factor of 104% in 2025 on 22.2 MW of net summer capacity, the 99th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 380 days at full output out of 365.

0%Shaded: the middle half of biomass plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Novo BioPower Plant104%
Biomass plants, 75th percentile65%
Biomass plants, median48%
Biomass plants, 25th percentile35%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. A factor above 100% means the units ran above their summer rating over the year. Values above 105% are left out of the comparison.

Is Novo BioPower Plant generating more or less than last year?

Novo BioPower Plant generated 202,323 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 11 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024168,105
2025202,323
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202517,808
November 202517,302
October 202514,529
September 202517,382
August 202517,682
July 202517,935
June 202516,186
May 202516,476
April 202517,010
March 202517,898
February 202515,980
January 202516,135
December 202414,388
November 202411,442
October 20240
September 202416,731
August 202415,011
July 202417,165
June 202415,897
May 202416,466
April 202413,976
March 202416,447
February 202414,638
January 202415,944

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from Novo BioPower Plant?

Novo BioPower Plant made 0.2% of the 115,800,378 MWh reported by Arizona plants in 2025, from 0.1% of the state's 40,514 MW of capacity. Its share of output is 2.6 times its share of capacity. By capacity it is the 114th largest of 191 plants in Arizona, the 4,487th largest of 14,327 in the U.S. and the 155th largest of 585 biomass plants. By 2025 generation it is the 58th largest of 167 generating plants in the state.

Novo BioPower Plant within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)2740,5140.1%
Generation (MWh)202,323115,800,3780.2%
Biomass capacity (MW)273381.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Novo BioPower Plant, and when do they retire?

1 operable generator totals 27.2 MW, with an average age of 17 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s127100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
G3OperatingWood/Wood Waste Biomass272008n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Novo BioPower Plant?

EIA lists no joint owners for Novo BioPower Plant. Novo Biopower LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is Novo BioPower Plant?

Novo BioPower Plant is in Snowflake, Navajo County, Arizona, at 34.5032° N, 110.3350° W. It sits in the Arizona Public Service Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.