Wind power plant, North Dakota

Oliver Wind III, LLC power plant, North Dakota

Oliver Wind III, LLC is a 99.3 MW wind power plant in Morton County, North Dakota, operated by Oliver Wind III, LLC, and it generated 380,104 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.9% of the generation reported in North Dakota, and its capacity factor sits at the 87th percentile of U.S. wind plants. By 2025 generation it ranks 1,652nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

99.3 MWNameplate capacity
44%Capacity factor, 2025, 87th percentile, on 99.3 MW net summer
0.9%Of ND generation, 2025
8 yearsAverage generator age, by MW

How hard does the Oliver Wind III, LLC plant run compared with other wind plants?

The Oliver Wind III, LLC plant had a capacity factor of 44% in 2025 on 99.3 MW of net summer capacity, the 87th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 159 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Oliver Wind III, LLC44%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Oliver Wind III, LLC plant generating more or less than last year?

Generation at Oliver Wind III, LLC fell 8.8% from 2024 to 2025, from 416,948 MWh to 380,104 MWh. Through August 2026 it is running 1.2% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024416,948
2025380,104
2026 through August253,378
2025, same months250,285
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202625,463
July 202621,510
June 202634,096
May 202637,720
April 202635,878
March 202634,511
February 202630,751
January 202633,449
December 202537,448
November 202531,600
October 202539,685
September 202521,086
August 202524,277
July 202519,893
June 202519,371
May 202534,490
April 202537,526
March 202533,910
February 202533,334
January 202547,484
December 202439,699
November 202434,466
October 202435,411
September 202438,105
August 202435,786
July 202423,823
June 202434,391
May 202431,852
April 202445,934
March 202436,041
February 202432,592
January 202428,848

Source: EIA Form EIA-923, through August 2026.

How much of North Dakota's electricity comes from the Oliver Wind III, LLC plant?

Oliver Wind III, LLC made 0.9% of the 42,873,330 MWh reported by North Dakota plants in 2025, from 0.9% of the state's 10,973 MW of capacity. By capacity it is the 37th largest of 62 plants in North Dakota, the 2,733rd largest of 14,327 in the U.S. and the 686th largest of 1,358 wind plants. By 2025 generation it is the 28th largest of 57 generating plants in the state.

Oliver Wind III, LLC within North Dakota, 2025
MeasureThis plantNorth DakotaShare
Capacity (MW)9910,9730.9%
Generation (MWh)380,10442,873,3300.9%
Wind capacity (MW)994,7292.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Oliver Wind III, LLC plant, and when do they retire?

1 operable generator totals 99.3 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s199100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
WT1OperatingOnshore Wind Turbine992017n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Oliver Wind III, LLC plant?

EIA lists no joint owners for Oliver Wind III, LLC. Oliver Wind III, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Oliver Wind III, LLC plant?

Oliver Wind III, LLC is in Mandan, Morton County, North Dakota, at 46.9571° N, 101.1681° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in North Dakota are similar in size?

North Dakota has 41 operable wind plants with 4,729 MW of capacity, and Oliver Wind III, LLC's 99.3 MW is 2% of that.

Wind plants in North Dakota around this size
PlantCountyMW2025 MWh
Sunflower Wind ProjectMorton104431,620
Baldwin Wind LLCBurleigh102384,087
New Frontier WindMcHenry100386,816
Oliver Wind III, LLCMorton99380,104
Bison I Wind Energy CenterMorton82196,484
Ashtabula Wind III LLCBarnes62119,861
FPL Energy North Dakota Wind I/IILaMoure62120,784

Source: EIA Forms EIA-860 and EIA-923, 2025.