Wind power plant, North Dakota
Baldwin Wind LLC power plant, North Dakota
Baldwin Wind LLC is a 102 MW wind power plant in Burleigh County, North Dakota, operated by Baldwin Wind LLC, and it generated 384,087 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.9% of the generation reported in North Dakota, and its capacity factor sits at the 85th percentile of U.S. wind plants. By 2025 generation it ranks 1,640th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Baldwin Wind LLC plant run compared with other wind plants?
The Baldwin Wind LLC plant had a capacity factor of 43% in 2025 on 102 MW of net summer capacity, the 85th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 156 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Baldwin Wind LLC | 43% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Baldwin Wind LLC plant generating more or less than last year?
Generation at Baldwin Wind LLC rose 0.8% from 2024 to 2025, from 381,144 MWh to 384,087 MWh.
| Period | MWh |
|---|---|
| 2024 | 381,144 |
| 2025 | 384,087 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 32,284 |
| November 2025 | 32,832 |
| October 2025 | 41,380 |
| September 2025 | 23,483 |
| August 2025 | 25,577 |
| July 2025 | 21,875 |
| June 2025 | 24,687 |
| May 2025 | 34,726 |
| April 2025 | 35,603 |
| March 2025 | 32,636 |
| February 2025 | 32,152 |
| January 2025 | 46,852 |
| December 2024 | 35,289 |
| November 2024 | 31,550 |
| October 2024 | 30,776 |
| September 2024 | 36,078 |
| August 2024 | 25,855 |
| July 2024 | 19,586 |
| June 2024 | 33,072 |
| May 2024 | 31,584 |
| April 2024 | 42,756 |
| March 2024 | 34,264 |
| February 2024 | 29,916 |
| January 2024 | 30,418 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Baldwin Wind LLC plant, and when do they retire?
1 operable generator totals 102 MW, with an average age of 15 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 102 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GE1 | Operating | Onshore Wind Turbine | 102 | 2010 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Baldwin Wind LLC plant?
EIA lists no joint owners for Baldwin Wind LLC. Baldwin Wind LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Baldwin Wind LLC plant?
Baldwin Wind LLC is in Wilton, Burleigh County, North Dakota, at 47.1133° N, 100.7086° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in North Dakota are similar in size?
North Dakota has 41 operable wind plants with 4,729 MW of capacity, and Baldwin Wind LLC's 102 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Bison 2 Wind Energy Center | Morton | 105 | 269,802 |
| Bison 3 Wind Energy Center | Morton | 105 | 267,944 |
| Sunflower Wind Project | Morton | 104 | 431,620 |
| Baldwin Wind LLC | Burleigh | 102 | 384,087 |
| New Frontier Wind | McHenry | 100 | 386,816 |
| Oliver Wind III, LLC | Morton | 99 | 380,104 |
| Bison I Wind Energy Center | Morton | 82 | 196,484 |
Source: EIA Forms EIA-860 and EIA-923, 2025.