Skip to main content
RateWatt

Wind power plant, North Dakota

Bison 2 Wind Energy Center, North Dakota

Bison 2 Wind Energy Center is a 105 MW wind power plant in Morton County, North Dakota, operated by ALLETE, Inc., and it generated 269,802 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in North Dakota, and its capacity factor sits at the 36th percentile of U.S. wind plants. By 2025 generation it ranks 2,115th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

105 MWNameplate capacity
29%Capacity factor, 2025, 36th percentile, on 105 MW net summer
0.6%Of ND generation, 2025
13 yearsAverage generator age, by MW

How hard does the Bison 2 Wind Energy Center plant run compared with other wind plants?

The Bison 2 Wind Energy Center plant had a capacity factor of 29% in 2025 on 105 MW of net summer capacity, the 36th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 107 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Bison 2 Wind Energy Center29%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Bison 2 Wind Energy Center plant generating more or less than last year?

Generation at Bison 2 Wind Energy Center rose 23.4% from 2024 to 2025, from 218,654 MWh to 269,802 MWh.

Net generation by period
PeriodMWh
2024218,654
2025269,802
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202525,609
November 202523,718
October 202532,001
September 202515,266
August 20259,573
July 202516,294
June 202514,761
May 202526,198
April 202525,773
March 202522,882
February 202521,482
January 202536,245
December 202424,085
November 202413,849
October 202415,727
September 202418,838
August 202418,268
July 202414,448
June 202418,559
May 202422,997
April 202425,326
March 202419,274
February 202416,640
January 202410,643

Source: EIA Form EIA-923, through August 2026.

How much of North Dakota's electricity comes from the Bison 2 Wind Energy Center plant?

Bison 2 Wind Energy Center made 0.6% of the 42,873,330 MWh reported by North Dakota plants in 2025, from 1.0% of the state's 10,973 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 32nd largest of 62 plants in North Dakota, the 2,496th largest of 14,327 in the U.S. and the 613th largest of 1,358 wind plants. By 2025 generation it is the 33rd largest of 57 generating plants in the state.

Bison 2 Wind Energy Center within North Dakota, 2025
MeasureThis plantNorth DakotaShare
Capacity (MW)10510,9731.0%
Generation (MWh)269,80242,873,3300.6%
Wind capacity (MW)1054,7292.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Bison 2 Wind Energy Center plant, and when do they retire?

1 operable generator totals 105 MW, with an average age of 13 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1105100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BISO2OperatingOnshore Wind Turbine1052012n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Bison 2 Wind Energy Center plant?

EIA lists no joint owners for Bison 2 Wind Energy Center. ALLETE, Inc. operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does ALLETE, Inc. charge homes?

ALLETE, Inc., the operator of Bison 2 Wind Energy Center, had an average residential price of 15.86¢ per kWh and an average bill of $107 a month in 2025 in Minnesota.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst North Dakota
ALLETE, Inc.15.86¢$107other state
North Dakota average11.82¢$126
U.S. average17.23¢$15146% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Bison 2 Wind Energy Center plant?

Bison 2 Wind Energy Center is in New Salem, Morton County, North Dakota, at 46.9800° N, 101.5547° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in North Dakota are similar in size?

North Dakota has 41 operable wind plants with 4,729 MW of capacity, and Bison 2 Wind Energy Center's 105 MW is 2% of that.

Wind plants in North Dakota around this size
PlantCountyMW2025 MWh
Langdon Renewables, LLCCavalier119489,309
Prairie Winds ND1Ward116353,768
Glen Ullin Energy CenterMorton107439,260
Bison 2 Wind Energy CenterMorton105269,802
Bison 3 Wind Energy CenterMorton105267,944
Sunflower Wind ProjectMorton104431,620
Baldwin Wind LLCBurleigh102384,087

Source: EIA Forms EIA-860 and EIA-923, 2025.