Wind power plant, North Dakota
Prairie Winds ND1 wind power plant, North Dakota
Prairie Winds ND1 is a 116 MW wind power plant in Ward County, North Dakota, operated by Basin Electric Power Coop, and it generated 353,768 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.8% of the generation reported in North Dakota, and its capacity factor sits at the 57th percentile of U.S. wind plants. By 2025 generation it ranks 1,761st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Prairie Winds ND1 plant run compared with other wind plants?
The Prairie Winds ND1 plant had a capacity factor of 35% in 2025 on 116 MW of net summer capacity, the 57th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 128 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Prairie Winds ND1 | 35% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Prairie Winds ND1 plant generating more or less than last year?
Generation at Prairie Winds ND1 rose 13.9% from 2024 to 2025, from 310,646 MWh to 353,768 MWh.
| Period | MWh |
|---|---|
| 2024 | 310,646 |
| 2025 | 353,768 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 29,726 |
| November 2025 | 30,993 |
| October 2025 | 37,137 |
| September 2025 | 25,352 |
| August 2025 | 25,764 |
| July 2025 | 21,086 |
| June 2025 | 20,740 |
| May 2025 | 30,103 |
| April 2025 | 25,519 |
| March 2025 | 24,412 |
| February 2025 | 35,247 |
| January 2025 | 47,689 |
| December 2024 | 37,651 |
| November 2024 | 24,891 |
| October 2024 | 23,327 |
| September 2024 | 22,945 |
| August 2024 | 27,189 |
| July 2024 | 15,046 |
| June 2024 | 28,094 |
| May 2024 | 26,445 |
| April 2024 | 24,524 |
| March 2024 | 23,497 |
| February 2024 | 24,656 |
| January 2024 | 32,381 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Prairie Winds ND1 plant, and when do they retire?
1 operable generator totals 116 MW, with an average age of 16 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 116 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| ND1 | Operating | Onshore Wind Turbine | 116 | 2009 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Prairie Winds ND1 plant?
EIA lists no joint owners for Prairie Winds ND1. Basin Electric Power Coop operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Prairie Winds ND1 plant?
Prairie Winds ND1 is in Minot, Ward County, North Dakota, at 47.9336° N, 101.2692° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in North Dakota are similar in size?
North Dakota has 41 operable wind plants with 4,729 MW of capacity, and Prairie Winds ND1's 116 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| FPL Energy Ashtabula Wind LLC | Barnes | 149 | 582,974 |
| Ashtabula Wind II LLC | Steele | 120 | 364,224 |
| Langdon Renewables, LLC | Cavalier | 119 | 489,309 |
| Prairie Winds ND1 | Ward | 116 | 353,768 |
| Glen Ullin Energy Center | Morton | 107 | 439,260 |
| Bison 2 Wind Energy Center | Morton | 105 | 269,802 |
| Bison 3 Wind Energy Center | Morton | 105 | 267,944 |
Source: EIA Forms EIA-860 and EIA-923, 2025.