Orion II Solar Project, Texas

Orion II Solar Project is a 250 MW solar power plant in Milam County, Texas, operated by Ben Milam Solar 2 LLC, and it generated 552,136 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 66th percentile of U.S. solar plants. By 2025 generation it ranks 1,235th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

250 MWNameplate capacity
25%Capacity factor, 2025, 66th percentile, on 250 MW net summer
0.1%Of TX generation, 2025
1 yearAverage generator age, by MW

How hard does the Orion II Solar Project plant run compared with other solar plants?

The Orion II Solar Project plant had a capacity factor of 25% in 2025 on 250 MW of net summer capacity, the 66th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 92 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Orion II Solar Project25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Orion II Solar Project plant generating more or less than last year?

Orion II Solar Project generated 552,136 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 0.1% ahead of the same months of 2025. 2024 has output for only 3 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024116,489
2025552,136
2026 through August386,208
2025, same months385,898
Monthly generation, Oct 2024 to Aug 2026
MonthMWh
August 202661,484
July 202662,736
June 202654,378
May 202650,211
April 202637,645
March 202652,216
February 202634,687
January 202632,851
December 202526,547
November 202536,565
October 202549,367
September 202553,759
August 202558,364
July 202553,632
June 202559,588
May 202553,297
April 202548,925
March 202549,438
February 202531,545
January 202531,109
December 202428,222
November 202436,327
October 202451,940

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Orion II Solar Project plant?

Orion II Solar Project made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 205th largest of 1,023 plants in Texas, the 1,239th largest of 14,327 in the U.S. and the 99th largest of 7,223 solar plants. By 2025 generation it is the 247th largest of 816 generating plants in the state.

Orion II Solar Project within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)250195,9660.1%
Generation (MWh)552,136592,896,1760.1%
Solar capacity (MW)25030,7390.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Orion II Solar Project plant, and when do they retire?

1 operable generator totals 250 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1250100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
ORN2OperatingSolar Photovoltaic2502024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Orion II Solar Project plant?

EIA lists no joint owners for Orion II Solar Project. Ben Milam Solar 2 LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Orion II Solar Project plant?

Orion II Solar Project is in Rosebud, Milam County, Texas, at 31.0290° N, 96.9348° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Orion II Solar Project's 250 MW is 1% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Sun Valley Solar ProjectHill250555,652
Pisgah Ridge Solar, LLCNavarro250509,316
Orion III Solar ProjectMilam250551,808
Orion II Solar ProjectMilam250552,136
Hopkins Energy LLCHopkins250572,220
Roaring Springs, LLCMotley25091,658
Porter Solar, LLC (TX)Denton245556,333

Source: EIA Forms EIA-860 and EIA-923, 2025.