Skip to main content
RateWatt

Solar power plant, Texas

Orion III Solar Project, Texas

Orion III Solar Project is a 250 MW solar power plant in Milam County, Texas, operated by Ben Milam Solar 3 LLC, and it generated 551,808 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 65th percentile of U.S. solar plants. By 2025 generation it ranks 1,238th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

250 MWNameplate capacity
25%Capacity factor, 2025, 65th percentile, on 250 MW net summer
0.1%Of TX generation, 2025
1 yearAverage generator age, by MW

How hard does the Orion III Solar Project plant run compared with other solar plants?

The Orion III Solar Project plant had a capacity factor of 25% in 2025 on 250 MW of net summer capacity, the 65th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 92 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Orion III Solar Project25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Orion III Solar Project plant generating more or less than last year?

Orion III Solar Project generated 551,808 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 3.9% behind the same months of 2025. 2024 has output for only 5 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024234,772
2025551,808
2026 through August374,231
2025, same months389,228
Monthly generation, Aug 2024 to Aug 2026
MonthMWh
August 202662,115
July 202660,075
June 202651,127
May 202651,484
April 202634,845
March 202649,751
February 202633,413
January 202631,421
December 202526,375
November 202535,771
October 202547,896
September 202552,538
August 202559,632
July 202550,438
June 202562,562
May 202554,656
April 202549,464
March 202549,676
February 202531,855
January 202530,945
December 202429,170
November 202436,653
October 202450,966
September 202452,053
August 202465,930

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Orion III Solar Project plant?

Orion III Solar Project made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 205th largest of 1,023 plants in Texas, the 1,239th largest of 14,327 in the U.S. and the 98th largest of 7,223 solar plants. By 2025 generation it is the 249th largest of 816 generating plants in the state.

Orion III Solar Project within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)250195,9660.1%
Generation (MWh)551,808592,896,1760.1%
Solar capacity (MW)25030,7390.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Orion III Solar Project plant, and when do they retire?

1 operable generator totals 250 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1250100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
ORN3OperatingSolar Photovoltaic2502024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Orion III Solar Project plant?

EIA lists no joint owners for Orion III Solar Project. Ben Milam Solar 3 LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Orion III Solar Project plant?

Orion III Solar Project is in Buckholts, Milam County, Texas, at 30.9602° N, 97.1245° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Orion III Solar Project's 250 MW is 1% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Prospero Solar IIAndrews250667,046
Sun Valley Solar ProjectHill250555,652
Pisgah Ridge Solar, LLCNavarro250509,316
Orion III Solar ProjectMilam250551,808
Orion II Solar ProjectMilam250552,136
Hopkins Energy LLCHopkins250572,220
Roaring Springs, LLCMotley25091,658

Source: EIA Forms EIA-860 and EIA-923, 2025.