Solar power plant, Texas
Prospero Solar II power plant, Texas
Prospero Solar II is a 250 MW solar power plant in Andrews County, Texas, operated by Prospero Solar II, LLC (Longroad), and it generated 667,046 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 93rd percentile of U.S. solar plants. By 2025 generation it ranks 1,037th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Prospero Solar II plant run compared with other solar plants?
The Prospero Solar II plant had a capacity factor of 30% in 2025 on 250 MW of net summer capacity, the 93rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 111 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Prospero Solar II | 30% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Prospero Solar II plant generating more or less than last year?
Generation at Prospero Solar II fell 2.0% from 2024 to 2025, from 680,602 MWh to 667,046 MWh. Through August 2026 it is running 0.7% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 680,602 |
| 2025 | 667,046 |
| 2026 through August | 480,198 |
| 2025, same months | 476,751 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 77,394 |
| July 2026 | 74,318 |
| June 2026 | 65,180 |
| May 2026 | 68,667 |
| April 2026 | 61,859 |
| March 2026 | 50,370 |
| February 2026 | 44,821 |
| January 2026 | 37,589 |
| December 2025 | 38,039 |
| November 2025 | 41,980 |
| October 2025 | 51,538 |
| September 2025 | 58,738 |
| August 2025 | 67,215 |
| July 2025 | 67,300 |
| June 2025 | 66,218 |
| May 2025 | 68,729 |
| April 2025 | 62,121 |
| March 2025 | 55,512 |
| February 2025 | 47,653 |
| January 2025 | 42,003 |
| December 2024 | 38,451 |
| November 2024 | 41,840 |
| October 2024 | 55,650 |
| September 2024 | 60,016 |
| August 2024 | 73,144 |
| July 2024 | 71,634 |
| June 2024 | 73,462 |
| May 2024 | 70,680 |
| April 2024 | 64,662 |
| March 2024 | 48,467 |
| February 2024 | 42,951 |
| January 2024 | 39,645 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Prospero Solar II plant, and when do they retire?
1 operable generator totals 250 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 250 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| PROSP | Operating | Solar Photovoltaic | 250 | 2021 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Prospero Solar II plant?
EIA lists no joint owners for Prospero Solar II. Prospero Solar II, LLC (Longroad) operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Prospero Solar II plant?
Prospero Solar II is in Andrews, Andrews County, Texas, at 32.2758° N, 102.8448° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Prospero Solar II's 250 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Samson Solar Energy | Franklin | 250 | 346,737 |
| Sparta Solar | Bee | 250 | 454,439 |
| Samson Solar Energy III LLC | Lamar | 250 | 277,992 |
| Prospero Solar II | Andrews | 250 | 667,046 |
| Sun Valley Solar Project | Hill | 250 | 555,652 |
| Pisgah Ridge Solar, LLC | Navarro | 250 | 509,316 |
| Orion III Solar Project | Milam | 250 | 551,808 |
Source: EIA Forms EIA-860 and EIA-923, 2025.