Solar power plant, Texas

Prospero Solar II power plant, Texas

Prospero Solar II is a 250 MW solar power plant in Andrews County, Texas, operated by Prospero Solar II, LLC (Longroad), and it generated 667,046 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 93rd percentile of U.S. solar plants. By 2025 generation it ranks 1,037th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

250 MWNameplate capacity
30%Capacity factor, 2025, 93rd percentile, on 250 MW net summer
0.1%Of TX generation, 2025
4 yearsAverage generator age, by MW

How hard does the Prospero Solar II plant run compared with other solar plants?

The Prospero Solar II plant had a capacity factor of 30% in 2025 on 250 MW of net summer capacity, the 93rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 111 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Prospero Solar II30%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Prospero Solar II plant generating more or less than last year?

Generation at Prospero Solar II fell 2.0% from 2024 to 2025, from 680,602 MWh to 667,046 MWh. Through August 2026 it is running 0.7% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024680,602
2025667,046
2026 through August480,198
2025, same months476,751
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202677,394
July 202674,318
June 202665,180
May 202668,667
April 202661,859
March 202650,370
February 202644,821
January 202637,589
December 202538,039
November 202541,980
October 202551,538
September 202558,738
August 202567,215
July 202567,300
June 202566,218
May 202568,729
April 202562,121
March 202555,512
February 202547,653
January 202542,003
December 202438,451
November 202441,840
October 202455,650
September 202460,016
August 202473,144
July 202471,634
June 202473,462
May 202470,680
April 202464,662
March 202448,467
February 202442,951
January 202439,645

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Prospero Solar II plant?

Prospero Solar II made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. By capacity it is the 205th largest of 1,023 plants in Texas, the 1,239th largest of 14,327 in the U.S. and the 91st largest of 7,223 solar plants. By 2025 generation it is the 196th largest of 816 generating plants in the state.

Prospero Solar II within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)250195,9660.1%
Generation (MWh)667,046592,896,1760.1%
Solar capacity (MW)25030,7390.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Prospero Solar II plant, and when do they retire?

1 operable generator totals 250 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1250100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PROSPOperatingSolar Photovoltaic2502021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Prospero Solar II plant?

EIA lists no joint owners for Prospero Solar II. Prospero Solar II, LLC (Longroad) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Prospero Solar II plant?

Prospero Solar II is in Andrews, Andrews County, Texas, at 32.2758° N, 102.8448° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Prospero Solar II's 250 MW is 1% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Samson Solar EnergyFranklin250346,737
Sparta SolarBee250454,439
Samson Solar Energy III LLCLamar250277,992
Prospero Solar IIAndrews250667,046
Sun Valley Solar ProjectHill250555,652
Pisgah Ridge Solar, LLCNavarro250509,316
Orion III Solar ProjectMilam250551,808

Source: EIA Forms EIA-860 and EIA-923, 2025.