Skip to main content
RateWatt

Solar power plant, Texas

Samson Solar Energy III LLC power plant, Texas

Samson Solar Energy III LLC is a 250 MW solar power plant in Lamar County, Texas, operated by Invenergy Services LLC, and it generated 277,992 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 9th percentile of U.S. solar plants. By 2025 generation it ranks 2,067th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

250 MWNameplate capacity
13%Capacity factor, 2025, 9th percentile, on 250 MW net summer
2,067thU.S. rank by generation, 2025
3 yearsAverage generator age, by MW

How hard does the Samson Solar Energy III LLC plant run compared with other solar plants?

The Samson Solar Energy III LLC plant had a capacity factor of 13% in 2025 on 250 MW of net summer capacity, the 9th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 46 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Samson Solar Energy III LLC13%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Samson Solar Energy III LLC plant generating more or less than last year?

Generation at Samson Solar Energy III LLC rose 31.1% from 2024 to 2025, from 211,966 MWh to 277,992 MWh. Through August 2026 it is running 11.9% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024211,966
2025277,992
2026 through August212,019
2025, same months189,489
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202632,919
July 202632,368
June 202629,264
May 202629,426
April 202623,445
March 202626,505
February 202623,547
January 202614,545
December 202512,864
November 202522,817
October 202523,154
September 202529,668
August 202530,569
July 202536,345
June 202532,047
May 202524,602
April 202512,552
March 202515,041
February 202519,476
January 202518,857
December 20249,070
November 20248,121
October 20248,976
September 202412,609
August 202417,675
July 202416,288
June 202421,186
May 202412,559
April 202419,916
March 202437,543
February 202428,693
January 202419,330

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Samson Solar Energy III LLC plant?

Samson Solar Energy III LLC made 0.0% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 205th largest of 1,023 plants in Texas, the 1,239th largest of 14,327 in the U.S. and the 90th largest of 7,223 solar plants. By 2025 generation it is the 400th largest of 816 generating plants in the state.

Samson Solar Energy III LLC within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)250195,9660.1%
Generation (MWh)277,992592,896,1760.0%
Solar capacity (MW)25030,7390.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Samson Solar Energy III LLC plant, and when do they retire?

1 operable generator totals 250 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1250100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingSolar Photovoltaic2502022n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Samson Solar Energy III LLC plant?

EIA lists no joint owners for Samson Solar Energy III LLC. Invenergy Services LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Samson Solar Energy III LLC plant?

Samson Solar Energy III LLC is in Cunningham, Lamar County, Texas, at 33.4265° N, 95.3574° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Samson Solar Energy III LLC's 250 MW is 1% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Galloway 1 Solar FarmConcho250551,888
Samson Solar EnergyFranklin250346,737
Sparta SolarBee250454,439
Samson Solar Energy III LLCLamar250277,992
Prospero Solar IIAndrews250667,046
Sun Valley Solar ProjectHill250555,652
Pisgah Ridge Solar, LLCNavarro250509,316

Source: EIA Forms EIA-860 and EIA-923, 2025.