Solar power plant, Texas
Galloway 1 Solar Farm, Texas
Galloway 1 Solar Farm is a 250 MW solar power plant in Concho County, Texas, operated by 225DD 8me LLC, and it generated 551,888 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 65th percentile of U.S. solar plants. By 2025 generation it ranks 1,237th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Galloway 1 Solar Farm plant run compared with other solar plants?
The Galloway 1 Solar Farm plant had a capacity factor of 25% in 2025 on 250 MW of net summer capacity, the 65th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 92 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Galloway 1 Solar Farm | 25% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Galloway 1 Solar Farm plant generating more or less than last year?
Generation at Galloway 1 Solar Farm rose 9.5% from 2024 to 2025, from 504,009 MWh to 551,888 MWh. Through August 2026 it is running 17.1% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 504,009 |
| 2025 | 551,888 |
| 2026 through August | 309,130 |
| 2025, same months | 372,935 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 61,596 |
| July 2026 | 64,612 |
| June 2026 | 37,052 |
| May 2026 | 31,279 |
| April 2026 | 31,279 |
| March 2026 | 26,676 |
| February 2026 | 28,226 |
| January 2026 | 28,410 |
| December 2025 | 31,809 |
| November 2025 | 35,157 |
| October 2025 | 55,665 |
| September 2025 | 56,322 |
| August 2025 | 65,035 |
| July 2025 | 53,223 |
| June 2025 | 58,146 |
| May 2025 | 51,308 |
| April 2025 | 46,631 |
| March 2025 | 35,114 |
| February 2025 | 31,595 |
| January 2025 | 31,883 |
| December 2024 | 28,763 |
| November 2024 | 35,717 |
| October 2024 | 46,082 |
| September 2024 | 52,906 |
| August 2024 | 64,693 |
| July 2024 | 59,526 |
| June 2024 | 50,725 |
| May 2024 | 35,064 |
| April 2024 | 33,285 |
| March 2024 | 41,133 |
| February 2024 | 31,545 |
| January 2024 | 24,570 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Galloway 1 Solar Farm plant, and when do they retire?
1 operable generator totals 250 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 250 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GSM01 | Operating | Solar Photovoltaic | 250 | 2021 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Galloway 1 Solar Farm plant?
EIA lists no joint owners for Galloway 1 Solar Farm. 225DD 8me LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Galloway 1 Solar Farm plant?
Galloway 1 Solar Farm is in Paint Rock, Concho County, Texas, at 31.4359° N, 99.7966° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Galloway 1 Solar Farm's 250 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Texas Solar Nova 1 | Kent | 252 | 706,257 |
| RE Maplewood | Pecos | 250 | 526,415 |
| Phoebe Solar | Winkler | 250 | 557,289 |
| Galloway 1 Solar Farm | Concho | 250 | 551,888 |
| Samson Solar Energy | Franklin | 250 | 346,737 |
| Sparta Solar | Bee | 250 | 454,439 |
| Samson Solar Energy III LLC | Lamar | 250 | 277,992 |
Source: EIA Forms EIA-860 and EIA-923, 2025.