Skip to main content
RateWatt

Solar power plant, Texas

RE Maplewood solar power plant, Texas

RE Maplewood is a 250 MW solar power plant in Pecos County, Texas, operated by Onward Energy, and it generated 526,415 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 57th percentile of U.S. solar plants. By 2025 generation it ranks 1,288th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

250 MWNameplate capacity
24%Capacity factor, 2025, 57th percentile, on 250 MW net summer
0.1%Of TX generation, 2025
4 yearsAverage generator age, by MW

How hard does the RE Maplewood plant run compared with other solar plants?

The RE Maplewood plant had a capacity factor of 24% in 2025 on 250 MW of net summer capacity, the 57th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 88 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
RE Maplewood24%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the RE Maplewood plant generating more or less than last year?

Generation at RE Maplewood fell 6.2% from 2024 to 2025, from 561,007 MWh to 526,415 MWh. Through August 2026 it is running 0.9% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024561,007
2025526,415
2026 through August356,202
2025, same months353,035
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202671,891
July 202663,001
June 202638,755
May 202649,867
April 202639,839
March 202631,474
February 202631,040
January 202630,335
December 202535,627
November 202537,502
October 202542,635
September 202557,616
August 202568,359
July 202564,520
June 202552,017
May 202552,315
April 20254,710
March 202536,919
February 202540,687
January 202533,508
December 202434,111
November 202435,141
October 202445,334
September 202446,744
August 202463,010
July 202457,653
June 202465,647
May 202462,719
April 202449,015
March 202443,570
February 202427,325
January 202430,738

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the RE Maplewood plant?

RE Maplewood made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 205th largest of 1,023 plants in Texas, the 1,239th largest of 14,327 in the U.S. and the 82nd largest of 7,223 solar plants. By 2025 generation it is the 269th largest of 816 generating plants in the state.

RE Maplewood within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)250195,9660.1%
Generation (MWh)526,415592,896,1760.1%
Solar capacity (MW)25030,7390.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the RE Maplewood plant, and when do they retire?

2 operable generators total 250 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2250100%none reported
Every generator, 5 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PV1OperatingSolar Photovoltaic2222021n/a
PV2OperatingSolar Photovoltaic282021n/a
PV3CancelledSolar Photovoltaic100n/an/a
PV4CancelledSolar Photovoltaic100n/an/a
PV5CancelledSolar Photovoltaic100n/an/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the RE Maplewood plant?

EIA lists no joint owners for RE Maplewood. Onward Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the RE Maplewood plant?

RE Maplewood is in McCamey, Pecos County, Texas, at 30.9766° N, 102.2578° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and RE Maplewood's 250 MW is 1% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Taygete Energy Project LLCPecos255547,505
Greasewood SolarPecos255408,300
Texas Solar Nova 1Kent252706,257
RE MaplewoodPecos250526,415
Phoebe SolarWinkler250557,289
Galloway 1 Solar FarmConcho250551,888
Samson Solar EnergyFranklin250346,737