Greasewood Solar is a 255 MW solar power plant in Pecos County, Texas, operated by Concho Bluff LLC, and it generated 408,300 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 18th percentile of U.S. solar plants. By 2025 generation it ranks 1,564th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

255 MWNameplate capacity
18%Capacity factor, 2025, 18th percentile, on 255 MW net summer
0.1%Of TX generation, 2025
4 yearsAverage generator age, by MW

How hard does the Greasewood Solar plant run compared with other solar plants?

The Greasewood Solar plant had a capacity factor of 18% in 2025 on 255 MW of net summer capacity, the 18th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 67 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Greasewood Solar18%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Greasewood Solar plant generating more or less than last year?

Generation at Greasewood Solar rose 141.9% from 2024 to 2025, from 168,806 MWh to 408,300 MWh. Through August 2026 it is running 14.4% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024168,806
2025408,300
2026 through August316,880
2025, same months276,974
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202671,845
July 202647,539
June 202633,044
May 202647,610
April 202632,894
March 202630,001
February 202625,706
January 202628,241
December 202530,662
November 202531,654
October 202528,182
September 202540,828
August 202548,099
July 202547,662
June 202541,515
May 202544,844
April 202535,979
March 202529,550
February 202513,156
January 202516,169
December 202419,585
November 202413,239
October 202420,444
September 202416,197
August 202413,873
July 20247,525
June 20248,421
May 202416,709
April 202414,844
March 202414,472
February 202410,741
January 202412,756

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Greasewood Solar plant?

Greasewood Solar made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 201st largest of 1,023 plants in Texas, the 1,215th largest of 14,327 in the U.S. and the 75th largest of 7,223 solar plants. By 2025 generation it is the 324th largest of 816 generating plants in the state.

Greasewood Solar within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)255195,9660.1%
Generation (MWh)408,300592,896,1760.1%
Solar capacity (MW)25530,7390.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Greasewood Solar plant, and when do they retire?

1 operable generator totals 255 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1255100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GREA1OperatingSolar Photovoltaic2552021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Greasewood Solar plant?

EIA lists no joint owners for Greasewood Solar. Concho Bluff LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Greasewood Solar plant?

Greasewood Solar is in Fort Stockton, Pecos County, Texas, at 31.0310° N, 102.4882° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Greasewood Solar's 255 MW is 1% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Titan Solar ProjectCulberson260579,535
Stampede Solar HybridHopkins256547,282
Taygete Energy Project LLCPecos255547,505
Greasewood SolarPecos255408,300
Texas Solar Nova 1Kent252706,257